Ralph D. Ellis
Affiliations: | Civil and Coastal Engineering | University of Florida, Gainesville, Gainesville, FL, United States |
Area:
Civil Engineering, Occupational Health and SafetyGoogle:
"Ralph Ellis"Bio:
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/ellisr.pdf?sfvrsn=984e10fa_0
https://trid.trb.org/view/853822
https://trid.trb.org/view/287797
Parents
Sign in to add mentorZohar J. Herbsman | grad student | 1989 | UF Gainesville | |
(Model for prediction of highway construction production rates) |
Children
Sign in to add traineeJae-Ho Pyeon | grad student | 2005 | UF Gainesville |
Jin-Lee Kim | grad student | 2006 | UF Gainesville |
Junyong Ahn | grad student | 2008 | UF Gainesville |
Eileen R. Pesantes-Tavares | grad student | 2011 | UF Gainesville |
Sevcan Agdas | grad student | 2013 | UF Gainesville |
Kyle Fisher | grad student | 2013 | UF Gainesville |
BETA: Related publications
See more...
Publications
You can help our author matching system! If you notice any publications incorrectly attributed to this author, please sign in and mark matches as correct or incorrect. |
Agdas D, Washington S, Ellis RD, et al. (2014) Analysis of distance learner value assessment of distance education in engineering Journal of Professional Issues in Engineering Education and Practice. 140 |
Minchin RE, Thurn SB, Ellis RD, et al. (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction Journal of Construction Engineering and Management. 139: 1055-1062 |
Forcael E, Ellis R, Jaramillo F. (2011) Design-Build-Finance in the US: The case of iROX, I-75 Road Expansion Project Revista De La Construccion. 10: 24-35 |
Kim JL, Ellis RD. (2011) Closure to "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. November 2008, Vol. 134, No. 11, pp. 904-913. 10.1061/(ASCE)0733-9364(2008)134:11(904) Journal of Construction Engineering and Management. 137: 166-168 |
Ssemakula ME, Liao G, Ellis RD, et al. (2011) Manufacturing integrated learning laboratory (MILL): A framework for determination of core learning outcomes in engineering curricula International Journal of Engineering Education. 27: 323-332 |
Ssemakula ME, Aguwa CC, Ellis RD, et al. (2011) Manufacturing Integrated Learning Lab (Mill): A curriculum model for hands-on manufacturing education Asee Annual Conference and Exposition, Conference Proceedings |
Kim JL, Ellis RD. (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm Journal of Construction Engineering and Management. 136: 160-169 |
Thomas HR, Ellis RD. (2009) Fundamental principles of weather mitigation Practice Periodical On Structural Design and Construction. 14: 29-35 |
Kim JL, Ellis RD. (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling Journal of Construction Engineering and Management. 134: 904-913 |
Ellis RD, Lee SH. (2006) Measuring project level productivity on transportation projects Journal of Construction Engineering and Management. 132: 314-320 |