Year |
Citation |
Score |
2019 |
Kaspi M, Zofi M, Teller R. Maximizing the profit per unit time for the travelling salesman problem Computers & Industrial Engineering. 135: 702-710. DOI: 10.1016/J.Cie.2019.06.050 |
0.466 |
|
2019 |
Teller R, Zofi M, Kaspi M. Minimizing the average searching time for an object within a graph Computational Optimization and Applications. 74: 517-545. DOI: 10.1007/S10589-019-00121-W |
0.405 |
|
2018 |
Elalouf H, Kaspi M, Elalouf A, Halachmi I. Optimal operation policy for a sustainable recirculation aquaculture system for ornamental fish: Simulation and response surface methodology Computers & Operations Research. 89: 230-240. DOI: 10.1016/J.Cor.2017.05.002 |
0.317 |
|
2017 |
Zofi M, Teller R, Kaspi M. Maximizing the profit per unit of time for the TSP with convex resource-dependent travelling times Journal of the Operational Research Society. 68: 1177-1182. DOI: 10.1057/S41274-016-0156-5 |
0.463 |
|
2016 |
Hermelin D, Kaspi M, Komusiewicz C, Navon B. Parameterized complexity of critical node cuts Theoretical Computer Science. 651: 62-75. DOI: 10.1016/J.Tcs.2016.08.018 |
0.317 |
|
2015 |
Shabtay D, Dover O, Kaspi M. Single-machine two-agent scheduling involving a just-in-time criterion International Journal of Production Research. 53: 2590-2604. DOI: 10.1080/00207543.2014.970706 |
0.422 |
|
2013 |
Shabtay D, Gaspar N, Kaspi M. A survey on offline scheduling with rejection Journal of Scheduling. 16: 3-28. DOI: 10.1007/S10951-012-0303-Z |
0.429 |
|
2013 |
Kaspi M, Zofi M, Teller R. Maximizing the profit per time unit for the travelling salesman problem 22nd International Conference On Production Research, Icpr 2013. |
0.319 |
|
2012 |
Shabtay D, Bensoussan Y, Kaspi M. A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system International Journal of Production Economics. 136: 67-74. DOI: 10.1016/J.Ijpe.2011.09.011 |
0.494 |
|
2011 |
Stern HI, Zofi M, Kaspi M. Solving the Multi Observer 3D Visual Area Coverage Scheduling Problem by Decomposition American Journal of Operations Research. 1: 118-133. DOI: 10.4236/Ajor.2011.13014 |
0.399 |
|
2011 |
Yedidsion L, Shabtay D, Kaspi M. Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling Discrete Applied Mathematics. 159: 1264-1278. DOI: 10.1016/J.Dam.2011.04.001 |
0.422 |
|
2009 |
Yedidsion L, Shabtay D, Korach E, Kaspi M. A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine International Journal of Production Economics. 119: 298-307. DOI: 10.1016/J.Ijpe.2009.03.003 |
0.509 |
|
2007 |
Leisman G, Kaspi M, Koch P. Computational and noncomputational systems in brain and cognition: can one mask the other? The International Journal of Neuroscience. 117: 681-710. PMID 17464785 DOI: 10.1080/00207450600773913 |
0.47 |
|
2007 |
Shabtay D, Kaspi M, Steiner G. The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times Iie Transactions (Institute of Industrial Engineers). 39: 539-557. DOI: 10.1080/07408170601181674 |
0.502 |
|
2007 |
Yedidsion L, Shabtay D, Kaspi M. A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine Journal of Scheduling. 10: 341-352. DOI: 10.1007/S10951-007-0044-6 |
0.47 |
|
2007 |
Shabtay D, Kaspi M. The efficiency range of economical cutting conditions for a multistage transfer machine under a failure replacement strategy International Journal of Advanced Manufacturing Technology. 34: 448-456. DOI: 10.1007/S00170-006-0617-0 |
0.426 |
|
2006 |
Shabtay D, Kaspi M. Parallel machine scheduling with a convex resource consumption function European Journal of Operational Research. 173: 92-107. DOI: 10.1016/J.Ejor.2004.12.008 |
0.488 |
|
2006 |
Kaspi M, Shabtay D. A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates Computers and Operations Research. 33: 3015-3033. DOI: 10.1016/J.Cor.2005.02.032 |
0.504 |
|
2006 |
Shabtay D, Kaspi M. Minimizing the makespan in open-shop scheduling problems with a convex resource consumption function Naval Research Logistics. 53: 204-216. DOI: 10.1002/Nav.20133 |
0.523 |
|
2004 |
Shabtay D, Kaspi M. Minimizing the total weighted flow time in a single machine with controllable processing times Computers and Operations Research. 31: 2279-2289. DOI: 10.1016/S0305-0548(03)00187-4 |
0.503 |
|
2004 |
Kaspi M, Shabtay D. Convex resource allocation for minimizing the makespan in a single machine with job release dates Computers and Operations Research. 31: 1481-1489. DOI: 10.1016/S0305-0548(03)00103-5 |
0.441 |
|
2003 |
Shabtay D, Kaspi M. The efficiency range of economical cutting conditions and tool replacement under the age replacement strategy International Journal of Production Research. 41: 2563-2580. DOI: 10.1080/0020754031000087247 |
0.384 |
|
2003 |
Kaspi M, Shabtay D. Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies International Journal of Production Research. 41: 2229-2247. DOI: 10.1080/0020754031000087175 |
0.471 |
|
2002 |
Kaspi M, Kesselman U, Tanchoco JMA. Optimal solution for the flow path design problem of a balanced unidirectional AGV system International Journal of Production Research. 40: 389-401. DOI: 10.1080/00207540110079761 |
0.429 |
|
2002 |
Shabtay D, Kaspi M. Optimization of the machining economics problem under the failure replacement strategy International Journal of Production Economics. 80: 213-230. DOI: 10.1016/S0925-5273(02)00255-4 |
0.452 |
|
2001 |
Kaspi M, Shabtay D. Optimization of the machining economics problem under the periodic control strategy International Journal of Production Research. 39: 3889-3900. DOI: 10.1080/00207540110068772 |
0.416 |
|
1994 |
Raz T, Kaspi M. Optimal sequencing of production and inspection operations International Journal of Production Research. 32: 209-221. DOI: 10.1080/00207549408956924 |
0.391 |
|
1993 |
Mehrez A, Kaspi M, Gitlitz O. An investigation of a simple logistic model International Journal of Production Economics. 29: 259-269. DOI: 10.1016/0925-5273(93)90032-G |
0.442 |
|
1992 |
Kaspi M, Dar-El EM. Process conditions of a stand-alone machining centre for maximum contribution to profit per unit time International Journal of Production Research. 30: 985-1004. DOI: 10.1080/00207549208942938 |
0.381 |
|
1991 |
Raz T, Kaspi M. Location and sequencing of imperfect inspection operations in serial multi-stage production systems International Journal of Production Research. 29: 1645-1659. DOI: 10.1080/00207549108948037 |
0.43 |
|
1991 |
Kaspi M, Rosenblatt MJ. On the economic ordering quantity for jointly replenished items International Journal of Production Research. 29: 107-114. DOI: 10.1080/00207549108930051 |
0.401 |
|
1991 |
Kaspi M. Determination of economic packaging set-up frequency of jointly replenished items Journal of the Operational Research Society. 42: 165-168. DOI: 10.1057/Jors.1991.28 |
0.387 |
|
1990 |
Kaspi M, Tanchoco JMA. Optimal flow path design of unidirectional AGV systems International Journal of Production Research. 28: 1023-1030. DOI: 10.1080/00207549008942772 |
0.393 |
|
1985 |
Rosenblatt MJ, Kaspi M. Note---A Dynamic Programming Algorithm for Joint Replenishment Under General Order Cost Functions Management Science. 31: 369-373. DOI: 10.1287/Mnsc.31.3.369 |
0.391 |
|
1985 |
Kaspi M, Rosenblatt MJ. The effectiveness of heuristic algorithms for multi-item inventory systems with joint replenishment costs International Journal of Production Research. 23: 110-116. DOI: 10.1080/00207548508904694 |
0.425 |
|
1983 |
Kaspi M, Rosenblatt MJ. An improvement of silver’s algorithm for the joint replenishment problem Iie Transactions (Institute of Industrial Engineers). 15: 264-267. DOI: 10.1080/05695558308974644 |
0.348 |
|
Show low-probability matches. |