Year |
Citation |
Score |
2020 |
Gupte A, Kalinowski T, Rigterink F, Waterer H. Extended formulations for convex hulls of some bilinear functions Discrete Optimization. 36: 100569. DOI: 10.1016/J.Disopt.2020.100569 |
0.355 |
|
2020 |
Kalinowski T, Matthews J, Waterer H. Scheduling of maintenance windows in a mining supply chain rail network Computers & Operations Research. 115: 104670. DOI: 10.1016/J.Cor.2019.03.016 |
0.421 |
|
2018 |
Lidén T, Kalinowski T, Waterer H. Resource considerations for integrated planning of railway traffic and maintenance windows Journal of Rail Transport Planning & Management. 8: 1-15. DOI: 10.1016/J.Jrtpm.2018.02.001 |
0.388 |
|
2016 |
Boland N, Clement R, Waterer H. A bucket indexed formulation for nonpreemptive single machine scheduling problems Informs Journal On Computing. 28: 14-30. DOI: 10.1287/Ijoc.2015.0661 |
0.386 |
|
2015 |
Boland N, Savelsbergh M, Waterer H. A decision support tool for generating shipping data for the Hunter Valley coal chain Computers & Operations Research. 53: 54-67. DOI: 10.1016/J.Cor.2014.07.016 |
0.346 |
|
2015 |
Phillips AE, Waterer H, Ehrgott M, Ryan DM. Integer programming methods for large-scale practical classroom assignment problems Computers and Operations Research. 53: 42-53. DOI: 10.1016/J.Cor.2014.07.012 |
0.424 |
|
2015 |
Savelsbergh MWP, Waterer H, Dall M, Moffiet C. Possession assessment and capacity evaluation of the Central Queensland Coal Network Euro Journal On Transportation and Logistics. 4: 139-173. DOI: 10.1007/S13676-014-0066-0 |
0.36 |
|
2014 |
Foster JD, Berry AM, Boland N, Waterer H. Comparison of Mixed-Integer Programming and Genetic Algorithm Methods for Distributed Generation Planning Ieee Transactions On Power Systems. 29: 833-843. DOI: 10.1109/Tpwrs.2013.2287880 |
0.404 |
|
2014 |
Boland N, Kalinowski T, Waterer H, Zheng L. Scheduling arc maintenance jobs in a network to maximize total flow over time Discrete Applied Mathematics. 163: 34-52. DOI: 10.1016/J.Dam.2012.05.027 |
0.441 |
|
2013 |
Akartunalı K, Boland N, Evans I, Wallace M, Waterer H. Airline planning benchmark problems-Part II: Passenger groups, utility and demand allocation Computers & Operations Research. 40: 793-804. DOI: 10.1016/J.Cor.2012.03.005 |
0.398 |
|
2013 |
Akartunalı K, Boland N, Evans I, Wallace M, Waterer H. Airline planning benchmark problems-Part I Computers & Operations Research. 40: 775-792. DOI: 10.1016/J.Cor.2012.02.012 |
0.469 |
|
2013 |
Boland N, Kalinowski T, Waterer H, Zheng L. Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain Journal of Scheduling. 16: 649-659. DOI: 10.1007/S10951-012-0284-Y |
0.471 |
|
2012 |
Smith OJ, Boland N, Waterer H. Solving shortest path problems with a weight constraint and replenishment arcs Computers and Operations Research. 39: 964-984. DOI: 10.1016/J.Cor.2011.07.017 |
0.421 |
|
2009 |
Zink F, Waterer H, Archer R, Schaefer L. Geometric optimization of a thermoacoustic regenerator International Journal of Thermal Sciences. 48: 2309-2322. DOI: 10.1016/J.Ijthermalsci.2009.05.007 |
0.308 |
|
2007 |
Waterer H. Lot sizing with inventory gains Operations Research Letters. 35: 759-766. DOI: 10.1016/J.Orl.2007.01.005 |
0.395 |
|
2002 |
Waterer H, Johnson EL, Nobili P, Savelsbergh MWP. The relation of time indexed formulations of single machine scheduling problems to the node packing problem Mathematical Programming. 93: 477-494. DOI: 10.1007/S10107-002-0335-9 |
0.509 |
|
2000 |
Philpott AB, Craddock M, Waterer H. Hydro-electric unit commitment subject to uncertain demand European Journal of Operational Research. 125: 410-424. DOI: 10.1016/S0377-2217(99)00172-1 |
0.459 |
|
Show low-probability matches. |