Year |
Citation |
Score |
2020 |
Slocum RF, Jones HL, Fletcher MT, McConnell BM, Hodgson TJ, Taheri J, Wilson JR. Improving chemotherapy infusion operations through the simulation of scheduling heuristics: a case study Health Systems. 1-16. DOI: 10.1080/20476965.2019.1709908 |
0.311 |
|
2019 |
McConnell BM, Hodgson TJ, Kay MG, King RE, Liu Y, Parlier GH, Thoney-Barletta K, Wilson JR. Assessing uncertainty and risk in an expeditionary military logistics network The Journal of Defense Modeling and Simulation. 154851291986059. DOI: 10.1177/1548512919860595 |
0.505 |
|
2018 |
Karagul HF, Warsing DP, Hodgson TJ, Kapadia MS, Uzsoy R. A comparison of mixed integer programming formulations of the capacitated lot-sizing problem International Journal of Production Research. 56: 7064-7084. DOI: 10.1080/00207543.2017.1401232 |
0.433 |
|
2015 |
Hanson BB, Hodgson TJ, Kay MG, King RE, Thoney-Barletta KA. On the economic lot scheduling problem: stock-out prevention and system feasibility International Journal of Production Research. DOI: 10.1080/00207543.2015.1005246 |
0.697 |
|
2014 |
Lobo BJ, Wilson JR, Thoney KA, Hodgson TJ, King RE. A practical method for evaluating worker allocations in large-scale dual resource constrained job shops Iie Transactions (Institute of Industrial Engineers). 46: 1209-1226. DOI: 10.1080/0740817X.2014.892231 |
0.814 |
|
2014 |
Lobo BJ, Thoney KA, Hodgson TJ, King RE, Wilson JR. A probabilistic characterization of allocation performance in a worker-constrained job shop International Series in Operations Research and Management Science. 200: 301-341. DOI: 10.1007/978-1-4614-9056-2_13 |
0.804 |
|
2013 |
Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic quality metrics Computers and Operations Research. 40: 2569-2584. DOI: 10.1016/J.Cor.2013.02.008 |
0.814 |
|
2013 |
Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. An effective lower bound on Lmax in a worker-constrained job shop Computers and Operations Research. 40: 328-343. DOI: 10.1016/J.Cor.2012.07.003 |
0.829 |
|
2011 |
Davis LB, King RE, Hodgson TJ, Wei W. Information sharing in capacity constrained supply chains under lost sales International Journal of Production Research. 49: 7469-7491. DOI: 10.1080/00207543.2010.535037 |
0.51 |
|
2009 |
Morales L, Lemaster RL, Jackson SD, Hodgson TJ. Determining the economics of new moulder configurations Forest Products Journal. 59: 60-66. DOI: 10.13073/0015-7473-59.11.60 |
0.733 |
|
2009 |
Davis LB, Hodgson TJ, King RE, Wei W. Technical note: A computationally efficient algorithm for undiscounted Markov Decision processes with restricted observations Naval Research Logistics. 56: 86-92. DOI: 10.1002/Nav.20329 |
0.6 |
|
2007 |
Taner MR, Hodgson TJ, King RE, Schultz SR. Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70. DOI: 10.1016/J.Cie.2006.10.008 |
0.811 |
|
2006 |
Laoboonlur P, Hodgson TJ, Thoney KA. Production scheduling in a knitted fabric dyeing and finishing process Journal of the Textile Institute. 97: 391-399. DOI: 10.1533/Joti.2006.0145 |
0.731 |
|
2006 |
Stanfield PM, King RE, Hodgson TJ. Determining sequence and ready times in a remanufacturing system Iie Transactions (Institute of Industrial Engineers). 38: 565-575. DOI: 10.1080/07408170500371830 |
0.674 |
|
2004 |
Schultz SR, Hodgson TJ, King RE, Thoney KA. Minimizing Lmax for large-scale, job-shop scheduling problems International Journal of Production Research. 42: 4893-4907. DOI: 10.1080/00207540410001721754 |
0.834 |
|
2004 |
Schultz SR, Hodgson TJ, King RE, Taner MR. Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330. DOI: 10.1080/00207540410001716561 |
0.831 |
|
2004 |
Hodgson TJ, Melendez B, Thoney KA, Trainor T. The Deployment Scheduling Analysis Tool (DSAT) Mathematical and Computer Modelling. 39: 905-924. DOI: 10.1016/S0895-7177(04)90561-4 |
0.737 |
|
2004 |
Wilson AD, King RE, Hodgson TJ. Scheduling non-similar groups on a flow line: Multiple group setups Robotics and Computer-Integrated Manufacturing. 20: 505-515. DOI: 10.1016/J.Rcim.2004.07.002 |
0.622 |
|
2003 |
Taner MR, Hodgson TJ, King RE, Thoney KA. Satisfying due-dates in a job shop with sequence-dependent family set-ups International Journal of Production Research. 41: 4153-4169. DOI: 10.1080/0020754031000149167 |
0.81 |
|
2003 |
Zozom A, Hodgson TJ, King RE, Weintraub AJ, Cormier D. Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates International Journal of Production Research. 41: 31-45. DOI: 10.1080/00207540210162992 |
0.703 |
|
2003 |
Joines JA, Sutton AB, Thoney K, King RE, Hodgson TJ. Implementing a simulation-based scheduling system for a two-plant operation Winter Simulation Conference Proceedings. 2: 1440-1448. |
0.309 |
|
2003 |
Cho EG, Thoney KA, Hodgson TJ, King RE. Rolling horizon scheduling of multi-factory supply chains Winter Simulation Conference Proceedings. 2: 1409-1416. |
0.833 |
|
2002 |
Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions. 34: 803-811. DOI: 10.1080/07408170208928913 |
0.817 |
|
2002 |
Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions (Institute of Industrial Engineers). 34: 803-811. DOI: 10.1023/A:1015500822105 |
0.826 |
|
2002 |
Thoney KA, Joines JA, Manninagarajan P, Hodgson TJ. Rolling horizon scheduling in large job shops Winter Simulation Conference Proceedings. 2: 1891-1896. |
0.819 |
|
2001 |
Yaghubian AR, Hodgson TJ, Joines JA. Dry-or-buy decision support for dry kiln scheduling in furniture production Iie Transactions (Institute of Industrial Engineers). 33: 131-136. DOI: 10.1023/A:1007603002606 |
0.524 |
|
2000 |
Hodgson TJ, King RE, Thoney K, Stanislaw N, Weintraub AJ, Zozom A. On satisfying due-dates in large job shops: Idle time insertion Iie Transactions (Institute of Industrial Engineers). 32: 177-180. DOI: 10.1023/A:1007618532627 |
0.83 |
|
1999 |
Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A. Scheduling with alternatives: a link between process planning and scheduling Iie Transactions (Institute of Industrial Engineers). 31: 1093-1102. DOI: 10.1080/07408179908969910 |
0.74 |
|
1999 |
Yaghubian AR, Hodgson TJ, Joines JA, Thomas Culbreth C, Huang JC. Dry kiln scheduling in furniture production Iie Transactions (Institute of Industrial Engineers). 31: 733-738. DOI: 10.1023/A:1007602127881 |
0.592 |
|
1998 |
Hodgson TJ, Cormier D, Weintraub AJ, Zozom A. Note. Satisfying due dates in large job shops Management Science. 44: 1442-1446. DOI: 10.1287/Mnsc.44.10.1442 |
0.604 |
|
1998 |
Huang JCC, Culbreth CT, Joines JA, King RE, Hodgson TJ. Decision support system for lumber procurement and dry kiln scheduling Forest Products Journal. 48: 51-59. |
0.429 |
|
1997 |
Hodgson TJ, King RE, Stanfield PM. Ready-time scheduling with stochastic service times Operations Research. 45: 779-783. DOI: 10.1287/Opre.45.5.779 |
0.664 |
|
1997 |
Hodgson TJ, Ge G, King RE, Said H. Dynamic lot size/sequencing policies in a multi-product, single-machine system Iie Transactions (Institute of Industrial Engineers). 29: 127-137. DOI: 10.1080/07408179708966320 |
0.601 |
|
1997 |
Stanfield PM, King RE, Hodgson TJ. Multi-objective stochastic scheduling of job ready times Annals of Operations Research. 70: 221-239. DOI: 10.1023/A:1018974221508 |
0.665 |
|
1993 |
King RE, Hodgson TJ, Chafee FW. Robot Task Scheduling in a Flexible Manufacturing Cell Iie Transactions (Institute of Industrial Engineers). 25: 80-87. DOI: 10.1080/07408179308964280 |
0.656 |
|
1992 |
Deleersnyder JL, Hodgson TJ, King RE, O’Grady PJ, Saw A A. Integrating Kanban Type Pull Systems and MRP type Push Systems: Insights from a Markovian Model Iie Transactions (Institute of Industrial Engineers). 24: 43-56. DOI: 10.1080/07408179208964223 |
0.53 |
|
1992 |
Wang D, Hodgson TJ. Computation reduction for a large-scale markov process model to analyse multistage production systems International Journal of Production Research. 30: 2411-2420. DOI: 10.1080/00207549208948163 |
0.313 |
|
1991 |
Hodgson TJ, Wang D. Optimal hybrid push/pull control strategies for a parallel multistage system: Part II International Journal of Production Research. 29: 1453-1460. DOI: 10.1080/00207549108948022 |
0.333 |
|
1990 |
Yamani A, Hodgson TJ, Martin-Vega LA. Single Aircraft Mid-Air Refueling Using Spherical Distances Operations Research. 38: 792-800. DOI: 10.1287/Opre.38.5.792 |
0.415 |
|
1989 |
Deleersnyder J, Hodgson TJ, Muller-Malek H, O'Grady PJ. Kanban controlled pull systems: an analytic approach Management Science. 35: 1079-1091. DOI: 10.1287/Mnsc.35.9.1079 |
0.461 |
|
1988 |
Ding FY, Hodgson TJ. On optimal and approximate policies for a multistage production/inventory problem International Journal of Production Research. 26: 1937-1942. DOI: 10.1080/00207548808948006 |
0.493 |
|
1988 |
Ding FY, Hodgson TJ, King RE. A methodology for computation reduction for specially structured large scale Markov decision problems European Journal of Operational Research. 34: 105-112. DOI: 10.1016/0377-2217(88)90461-4 |
0.626 |
|
1987 |
Hodgson TJ, King RE, McClave JT, Sullivan JH, Zegel WC. Analysis and Modeling of a Proposed Mining and Beneficiation Process. Industrial & Engineering Chemistry Research. 26: 2223-2228. DOI: 10.1021/Ie00071A009 |
0.502 |
|
1986 |
Hodgson TJ, Nuttle HLW. A note on linear programming and the single machine lot size scheduling problem International Journal of Production Research. 24: 939-943. DOI: 10.1080/00207548608919778 |
0.455 |
|
1985 |
Carlo H, Hodgson TJ, Martin-Vega LA, Stern ER. Micro-IPLS: Pallet loading on a microcomputer Computers and Industrial Engineering. 9: 29-34. DOI: 10.1016/0360-8352(85)90034-8 |
0.328 |
|
1983 |
Hodgson TJ, Hughes DS, Martin-Vega LA. A note on a combined approach to the pallet loading problem Iie Transactions (Institute of Industrial Engineers). 15: 268-271. DOI: 10.1080/05695558308974645 |
0.394 |
|
1974 |
Dorsey RC, Hodgson TJ, Ratliff HD. Technical Note—A Production-Scheduling Problem with Batch Processing Operations Research. 22: 1271-1279. DOI: 10.1287/Opre.22.6.1271 |
0.436 |
|
1973 |
Ferreira AC, Hodgson TJ. An n-product, multi-machine, lotsize scheduling model Aiie Transactions. 5: 237-244. DOI: 10.1080/05695557308974907 |
0.413 |
|
1972 |
Hodgson TJ. An Analytical Model of a Two-Product, One-Machine, Production-Inventory System Management Science. 19: 391-405. DOI: 10.1287/Mnsc.19.4.391 |
0.343 |
|
Show low-probability matches. |