Thom J. Hodgson - Publications

Affiliations: 
1970-1983 Industrial & Systems Engineering University of Florida, Gainesville, Gainesville, FL, United States 
 1983- Industrial Engineering North Carolina State University, Raleigh, NC 
Area:
Industrial Engineering, Operations Research, Management Business Administration
Website:
https://www.ise.ncsu.edu/people/hodgson/

49 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Slocum RF, Jones HL, Fletcher MT, McConnell BM, Hodgson TJ, Taheri J, Wilson JR. Improving chemotherapy infusion operations through the simulation of scheduling heuristics: a case study Health Systems. 1-16. DOI: 10.1080/20476965.2019.1709908  0.311
2019 McConnell BM, Hodgson TJ, Kay MG, King RE, Liu Y, Parlier GH, Thoney-Barletta K, Wilson JR. Assessing uncertainty and risk in an expeditionary military logistics network The Journal of Defense Modeling and Simulation. 154851291986059. DOI: 10.1177/1548512919860595  0.505
2018 Karagul HF, Warsing DP, Hodgson TJ, Kapadia MS, Uzsoy R. A comparison of mixed integer programming formulations of the capacitated lot-sizing problem International Journal of Production Research. 56: 7064-7084. DOI: 10.1080/00207543.2017.1401232  0.433
2015 Hanson BB, Hodgson TJ, Kay MG, King RE, Thoney-Barletta KA. On the economic lot scheduling problem: stock-out prevention and system feasibility International Journal of Production Research. DOI: 10.1080/00207543.2015.1005246  0.697
2014 Lobo BJ, Wilson JR, Thoney KA, Hodgson TJ, King RE. A practical method for evaluating worker allocations in large-scale dual resource constrained job shops Iie Transactions (Institute of Industrial Engineers). 46: 1209-1226. DOI: 10.1080/0740817X.2014.892231  0.814
2014 Lobo BJ, Thoney KA, Hodgson TJ, King RE, Wilson JR. A probabilistic characterization of allocation performance in a worker-constrained job shop International Series in Operations Research and Management Science. 200: 301-341. DOI: 10.1007/978-1-4614-9056-2_13  0.804
2013 Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic quality metrics Computers and Operations Research. 40: 2569-2584. DOI: 10.1016/J.Cor.2013.02.008  0.814
2013 Lobo BJ, Hodgson TJ, King RE, Thoney KA, Wilson JR. An effective lower bound on Lmax in a worker-constrained job shop Computers and Operations Research. 40: 328-343. DOI: 10.1016/J.Cor.2012.07.003  0.829
2011 Davis LB, King RE, Hodgson TJ, Wei W. Information sharing in capacity constrained supply chains under lost sales International Journal of Production Research. 49: 7469-7491. DOI: 10.1080/00207543.2010.535037  0.51
2009 Morales L, Lemaster RL, Jackson SD, Hodgson TJ. Determining the economics of new moulder configurations Forest Products Journal. 59: 60-66. DOI: 10.13073/0015-7473-59.11.60  0.733
2009 Davis LB, Hodgson TJ, King RE, Wei W. Technical note: A computationally efficient algorithm for undiscounted Markov Decision processes with restricted observations Naval Research Logistics. 56: 86-92. DOI: 10.1002/Nav.20329  0.6
2007 Taner MR, Hodgson TJ, King RE, Schultz SR. Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure Computers and Industrial Engineering. 52: 57-70. DOI: 10.1016/J.Cie.2006.10.008  0.811
2006 Laoboonlur P, Hodgson TJ, Thoney KA. Production scheduling in a knitted fabric dyeing and finishing process Journal of the Textile Institute. 97: 391-399. DOI: 10.1533/Joti.2006.0145  0.731
2006 Stanfield PM, King RE, Hodgson TJ. Determining sequence and ready times in a remanufacturing system Iie Transactions (Institute of Industrial Engineers). 38: 565-575. DOI: 10.1080/07408170500371830  0.674
2004 Schultz SR, Hodgson TJ, King RE, Thoney KA. Minimizing Lmax for large-scale, job-shop scheduling problems International Journal of Production Research. 42: 4893-4907. DOI: 10.1080/00207540410001721754  0.834
2004 Schultz SR, Hodgson TJ, King RE, Taner MR. Minimizing Lmax for the single machine scheduling problem with family set-ups International Journal of Production Research. 42: 4315-4330. DOI: 10.1080/00207540410001716561  0.831
2004 Hodgson TJ, Melendez B, Thoney KA, Trainor T. The Deployment Scheduling Analysis Tool (DSAT) Mathematical and Computer Modelling. 39: 905-924. DOI: 10.1016/S0895-7177(04)90561-4  0.737
2004 Wilson AD, King RE, Hodgson TJ. Scheduling non-similar groups on a flow line: Multiple group setups Robotics and Computer-Integrated Manufacturing. 20: 505-515. DOI: 10.1016/J.Rcim.2004.07.002  0.622
2003 Taner MR, Hodgson TJ, King RE, Thoney KA. Satisfying due-dates in a job shop with sequence-dependent family set-ups International Journal of Production Research. 41: 4153-4169. DOI: 10.1080/0020754031000149167  0.81
2003 Zozom A, Hodgson TJ, King RE, Weintraub AJ, Cormier D. Integrated job release and shop-floor scheduling to minimize WIP and meet due-dates International Journal of Production Research. 41: 31-45. DOI: 10.1080/00207540210162992  0.703
2003 Joines JA, Sutton AB, Thoney K, King RE, Hodgson TJ. Implementing a simulation-based scheduling system for a two-plant operation Winter Simulation Conference Proceedings. 2: 1440-1448.  0.309
2003 Cho EG, Thoney KA, Hodgson TJ, King RE. Rolling horizon scheduling of multi-factory supply chains Winter Simulation Conference Proceedings. 2: 1409-1416.  0.833
2002 Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions. 34: 803-811. DOI: 10.1080/07408170208928913  0.817
2002 Thoney KA, Hodgson TJ, King RE, Taner MR, Wilson AD. Satisfying due-dates in large multi-factory supply chains Iie Transactions (Institute of Industrial Engineers). 34: 803-811. DOI: 10.1023/A:1015500822105  0.826
2002 Thoney KA, Joines JA, Manninagarajan P, Hodgson TJ. Rolling horizon scheduling in large job shops Winter Simulation Conference Proceedings. 2: 1891-1896.  0.819
2001 Yaghubian AR, Hodgson TJ, Joines JA. Dry-or-buy decision support for dry kiln scheduling in furniture production Iie Transactions (Institute of Industrial Engineers). 33: 131-136. DOI: 10.1023/A:1007603002606  0.524
2000 Hodgson TJ, King RE, Thoney K, Stanislaw N, Weintraub AJ, Zozom A. On satisfying due-dates in large job shops: Idle time insertion Iie Transactions (Institute of Industrial Engineers). 32: 177-180. DOI: 10.1023/A:1007618532627  0.83
1999 Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A. Scheduling with alternatives: a link between process planning and scheduling Iie Transactions (Institute of Industrial Engineers). 31: 1093-1102. DOI: 10.1080/07408179908969910  0.74
1999 Yaghubian AR, Hodgson TJ, Joines JA, Thomas Culbreth C, Huang JC. Dry kiln scheduling in furniture production Iie Transactions (Institute of Industrial Engineers). 31: 733-738. DOI: 10.1023/A:1007602127881  0.592
1998 Hodgson TJ, Cormier D, Weintraub AJ, Zozom A. Note. Satisfying due dates in large job shops Management Science. 44: 1442-1446. DOI: 10.1287/Mnsc.44.10.1442  0.604
1998 Huang JCC, Culbreth CT, Joines JA, King RE, Hodgson TJ. Decision support system for lumber procurement and dry kiln scheduling Forest Products Journal. 48: 51-59.  0.429
1997 Hodgson TJ, King RE, Stanfield PM. Ready-time scheduling with stochastic service times Operations Research. 45: 779-783. DOI: 10.1287/Opre.45.5.779  0.664
1997 Hodgson TJ, Ge G, King RE, Said H. Dynamic lot size/sequencing policies in a multi-product, single-machine system Iie Transactions (Institute of Industrial Engineers). 29: 127-137. DOI: 10.1080/07408179708966320  0.601
1997 Stanfield PM, King RE, Hodgson TJ. Multi-objective stochastic scheduling of job ready times Annals of Operations Research. 70: 221-239. DOI: 10.1023/A:1018974221508  0.665
1993 King RE, Hodgson TJ, Chafee FW. Robot Task Scheduling in a Flexible Manufacturing Cell Iie Transactions (Institute of Industrial Engineers). 25: 80-87. DOI: 10.1080/07408179308964280  0.656
1992 Deleersnyder JL, Hodgson TJ, King RE, O’Grady PJ, Saw A A. Integrating Kanban Type Pull Systems and MRP type Push Systems: Insights from a Markovian Model Iie Transactions (Institute of Industrial Engineers). 24: 43-56. DOI: 10.1080/07408179208964223  0.53
1992 Wang D, Hodgson TJ. Computation reduction for a large-scale markov process model to analyse multistage production systems International Journal of Production Research. 30: 2411-2420. DOI: 10.1080/00207549208948163  0.313
1991 Hodgson TJ, Wang D. Optimal hybrid push/pull control strategies for a parallel multistage system: Part II International Journal of Production Research. 29: 1453-1460. DOI: 10.1080/00207549108948022  0.333
1990 Yamani A, Hodgson TJ, Martin-Vega LA. Single Aircraft Mid-Air Refueling Using Spherical Distances Operations Research. 38: 792-800. DOI: 10.1287/Opre.38.5.792  0.415
1989 Deleersnyder J, Hodgson TJ, Muller-Malek H, O'Grady PJ. Kanban controlled pull systems: an analytic approach Management Science. 35: 1079-1091. DOI: 10.1287/Mnsc.35.9.1079  0.461
1988 Ding FY, Hodgson TJ. On optimal and approximate policies for a multistage production/inventory problem International Journal of Production Research. 26: 1937-1942. DOI: 10.1080/00207548808948006  0.493
1988 Ding FY, Hodgson TJ, King RE. A methodology for computation reduction for specially structured large scale Markov decision problems European Journal of Operational Research. 34: 105-112. DOI: 10.1016/0377-2217(88)90461-4  0.626
1987 Hodgson TJ, King RE, McClave JT, Sullivan JH, Zegel WC. Analysis and Modeling of a Proposed Mining and Beneficiation Process. Industrial & Engineering Chemistry Research. 26: 2223-2228. DOI: 10.1021/Ie00071A009  0.502
1986 Hodgson TJ, Nuttle HLW. A note on linear programming and the single machine lot size scheduling problem International Journal of Production Research. 24: 939-943. DOI: 10.1080/00207548608919778  0.455
1985 Carlo H, Hodgson TJ, Martin-Vega LA, Stern ER. Micro-IPLS: Pallet loading on a microcomputer Computers and Industrial Engineering. 9: 29-34. DOI: 10.1016/0360-8352(85)90034-8  0.328
1983 Hodgson TJ, Hughes DS, Martin-Vega LA. A note on a combined approach to the pallet loading problem Iie Transactions (Institute of Industrial Engineers). 15: 268-271. DOI: 10.1080/05695558308974645  0.394
1974 Dorsey RC, Hodgson TJ, Ratliff HD. Technical Note—A Production-Scheduling Problem with Batch Processing Operations Research. 22: 1271-1279. DOI: 10.1287/Opre.22.6.1271  0.436
1973 Ferreira AC, Hodgson TJ. An n-product, multi-machine, lotsize scheduling model Aiie Transactions. 5: 237-244. DOI: 10.1080/05695557308974907  0.413
1972 Hodgson TJ. An Analytical Model of a Two-Product, One-Machine, Production-Inventory System Management Science. 19: 391-405. DOI: 10.1287/Mnsc.19.4.391  0.343
Show low-probability matches.