Year |
Citation |
Score |
2019 |
Rabadi G, Msakni MK, Rodriguez-Velasquez E, Alvarez-Bermudez W. New characteristics of optimal solutions for the two-machine flowshop problem with unlimited buffers Journal of the Operational Research Society. 70: 962-973. DOI: 10.1080/01605682.2018.1475114 |
0.792 |
|
2018 |
Msakni MK, Al-Salem M, Rabadi G, Kotachi M, Diabat A. Quay Crane Scheduling with Vessel Stability Transportation Research Procedia. 30: 60-69. DOI: 10.1016/J.Trpro.2018.09.008 |
0.442 |
|
2018 |
Msakni MK, Diabat A, Rabadi G, Al-Salem M, Kotachi M. Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level Computers & Operations Research. 99: 218-233. DOI: 10.1016/J.Cor.2018.07.005 |
0.576 |
|
2017 |
Khasawneh MT, Shearer NEN, Rabadi G, Bowling SR. The information age combat model: a vision for a discrete event simulation approach International Journal of Simulation and Process Modelling. 12: 429-445. DOI: 10.1504/Ijspm.2017.10008526 |
0.663 |
|
2017 |
Khasawneh MT, Rabadi G, Bowling S, Shearer N. Using integer partitioning to determine unique configurations for the information age combat model International Journal of Industrial and Systems Engineering. 26: 364-379. DOI: 10.1504/Ijise.2017.10005107 |
0.714 |
|
2017 |
Arin A, Rabadi G. Integrating estimation of distribution algorithms versus Q-learning into Meta-RaPS for solving the 0-1 multidimensional knapsack problem Computers & Industrial Engineering. 112: 706-720. DOI: 10.1016/J.Cie.2016.10.022 |
0.813 |
|
2016 |
Al-Salem M, Bedoya-Valencia L, Rabadi G. Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem Mathematical Problems in Engineering. 2016: 1-11. DOI: 10.1155/2016/6591632 |
0.842 |
|
2016 |
Arin A, Rabadi G. Local search versus Path Relinking in metaheuristics: Redesigning Meta-RaPS with application to the multidimensional knapsack problem Applied Soft Computing Journal. 46: 317-327. DOI: 10.1016/J.Asoc.2016.05.016 |
0.812 |
|
2016 |
Soykan B, Rabadi G. A tabu search algorithm for the multiple runway aircraft scheduling problem International Series in Operations Research and Management Science. 236: 165-186. DOI: 10.1007/978-3-319-26024-2_9 |
0.469 |
|
2016 |
Arin A, Rabadi G. Performance of an intensification strategy based on learning in a metaheuristic: Meta-RaPS with path relinking International Series in Operations Research and Management Science. 236: 109-126. DOI: 10.1007/978-3-319-26024-2_6 |
0.805 |
|
2016 |
Garcia C, Rabadi G. Approximation algorithms for spatial scheduling International Series in Operations Research and Management Science. 236: 1-16. DOI: 10.1007/978-3-319-26024-2_1 |
0.347 |
|
2015 |
Arin A, Rabadi G. Statistical learning versus machine learning: Integrating estimation of distribution algorithms versus Q-learning into meta-RaPS Proceedings - Cie 45: 2015 International Conference On Computers and Industrial Engineering. |
0.789 |
|
2014 |
Deller S, Tolk A, Rabadi G, Bowling S. Improving C2 effectiveness based on robust connectivity Network Topology in Command and Control: Organization, Operation, and Evolution. 176-190. DOI: 10.4018/978-1-4666-6058-8.ch008 |
0.568 |
|
2014 |
Köksalmiş E, Garcia C, Rabadi G. The optimal exam experience: A timetabling approach to prevent student cheating and fatigue International Journal of Operational Research. 21: 263-278. DOI: 10.1504/Ijor.2014.065408 |
0.413 |
|
2014 |
Al-Duoli F, Rabadi G. Data mining based hybridization of Meta-RaPS Procedia Computer Science. 36: 301-307. DOI: 10.1016/J.Procs.2014.09.097 |
0.412 |
|
2014 |
Arnaout JP, Musa R, Rabadi G. A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines - Part II: Enhancements and experimentations Journal of Intelligent Manufacturing. 25: 43-53. DOI: 10.1007/S10845-012-0672-3 |
0.519 |
|
2013 |
Bowling SR, Rabadi G, Khasawneh MT, Shearer NEN. Sensitivity analysis framework for large-scale system-of-systems applications International Journal of System of Systems Engineering. 4: 1-22. DOI: 10.1504/Ijsse.2013.053487 |
0.625 |
|
2013 |
Kaplan S, Rabadi G. Simulated annealing and metaheuristic for randomized priority search algorithms for the aerial refuelling parallel machine scheduling problem with due date-to-deadline windows and release times Engineering Optimization. 45: 67-87. DOI: 10.1080/0305215X.2012.658783 |
0.829 |
|
2013 |
Kotachi M, Rabadi G, Obeid MF. Simulation modeling and analysis of complex port operations with multimodal transportation Procedia Computer Science. 20: 229-234. DOI: 10.1016/J.Procs.2013.09.266 |
0.317 |
|
2013 |
Al-Duoli F, Rabadi G. Employing learning to improve the performance of meta-RaPS Procedia Computer Science. 20: 46-51. DOI: 10.1016/J.Procs.2013.09.237 |
0.424 |
|
2013 |
Hancerliogullari G, Rabadi G, Al-Salem AH, Kharbeche M. Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem Journal of Air Transport Management. 32: 39-48. DOI: 10.1016/J.Jairtraman.2013.06.001 |
0.836 |
|
2013 |
Garcia C, Rabadi G. Exact and approximate methods for parallel multiple-area spatial scheduling with release times Or Spectrum. 35: 639-657. DOI: 10.1007/S00291-012-0301-8 |
0.555 |
|
2013 |
Arin A, Rabadi G. Memory and learning in metaheuristics Studies in Computational Intelligence. 427: 435-476. DOI: 10.1007/978-3-642-29694-9-18 |
0.814 |
|
2012 |
Deller S, Rabadi G, Tolk A, Bowling SR. Organizing for improved effectiveness in networked operations Military Operations Research. 17: 5-16. DOI: 10.5711/1082598317105 |
0.587 |
|
2012 |
Bowling SR, Rabadi G, Khasawneh MT, Shearer NEN, Zhang J. Initiative mapping methodology for system-ofsystems applications International Journal of Industrial and Systems Engineering. 10: 75-95. DOI: 10.1504/Ijise.2012.044044 |
0.651 |
|
2012 |
Arin A, Rabadi G. Meta-RaPS with path relinking for the 0-1 multidimensional knapsack problem Is'2012 - 2012 6th Ieee International Conference Intelligent Systems, Proceedings. 347-352. DOI: 10.1109/IS.2012.6335159 |
0.829 |
|
2012 |
Kaplan S, Rabadi G. Exact and heuristic algorithms for the aerial refueling parallel machine scheduling problem with due date-to-deadline window and ready times Computers and Industrial Engineering. 62: 276-285. DOI: 10.1016/J.Cie.2011.09.015 |
0.834 |
|
2012 |
Arin A, Rabadi G. Meta-RaPS with Q learning approach intensified by path relinking for the 0-1 multidimensional knapsack problem Proceedings of the 2012 International Conference On Artificial Intelligence, Icai 2012. 1: 201-208. |
0.777 |
|
2012 |
Garcia C, Rabadi G. Robust optimization models for volunteer scheduling 62nd Iie Annual Conference and Expo 2012. 1853-1858. |
0.372 |
|
2012 |
Rabadi G, Hancerliogullari G, Kharbeche M, Al-Salem A. Meta-heuristics for aircraft arrival and departure scheduling on multiple runways 62nd Iie Annual Conference and Expo 2012. 1235-1242. |
0.837 |
|
2012 |
Hancerliogullari G, Rabadi G, Kharbeche M, Al-Salem A. Heuristic algorithms for aircraft sequencing problem Annual International Conference of the American Society For Engineering Management 2012, Asem 2012 - Agile Management: Embracing Change and Uncertainty in Engineering Management. 773-779. |
0.822 |
|
2011 |
Garcia C, Rabadi G. Optimising coordinated multi-team volunteer scheduling: A combined constraint programming and goal programming approach International Journal of Industrial and Systems Engineering. 9: 183-194. DOI: 10.1504/Ijise.2011.042834 |
0.406 |
|
2011 |
Arin A, Rabadi G, Unal R. Comparative studies on design of experiments for tuning parameters in a genetic algorithm for a scheduling problem International Journal of Experimental Design and Process Optimisation. 2: 102. DOI: 10.1504/Ijedpo.2011.040262 |
0.805 |
|
2010 |
Rodriguez-Velasquez E, Arnaout G, Rabadi G, Musa R. Modeling cross-dock networks with time constraints using simulation 2010 Ieee Systems and Information Engineering Design Symposium, Sieds10. 52-56. DOI: 10.1109/SIEDS.2010.5469678 |
0.784 |
|
2010 |
Arnaout JP, Rabadi G, Musa R. A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times Journal of Intelligent Manufacturing. 21: 693-701. DOI: 10.1007/S10845-009-0246-1 |
0.574 |
|
2010 |
Arnaout G, Rodriguez-Velasquez E, Rabadi G, Musa R. Modeling cross-docking operations using discrete event simulation Ceur Workshop Proceedings. 601: 113-120. |
0.788 |
|
2008 |
Arnaout JP, Rabadi G. Rescheduling of unrelated parallel machines under machine breakdowns International Journal of Applied Management Science. 1: 75-89. DOI: 10.1504/Ijams.2008.020040 |
0.446 |
|
2008 |
Arnaout JP, Musa R, Rabadi G. Ant colony optimization algorithm to parallel machine scheduling problem with setups 4th Ieee Conference On Automation Science and Engineering, Case 2008. 578-582. DOI: 10.1109/COASE.2008.4626566 |
0.517 |
|
2008 |
Kaylani A, Mollaghasemi M, Cope D, Fayez S, Rabadi G, Steele M. A generic environment for modelling future launch operations - GEM-FLO: A success story in generic modelling Journal of the Operational Research Society. 59: 1312-1320. DOI: 10.1057/Palgrave.Jors.2602478 |
0.355 |
|
2007 |
Rabadi G, Anagnostopoulos GC, Mollaghasemi M. A heuristic algorithm for the just-in-time single machine scheduling problem with setups: A comparison with simulated annealing International Journal of Advanced Manufacturing Technology. 32: 326-335. DOI: 10.1007/S00170-005-0333-1 |
0.599 |
|
2007 |
Arnaout JP, Rabadi G. Predictable scheduling with learning capability for the unrelated parallel machine problem International Journal of Operations and Quantitative Management. 13: 115-127. |
0.332 |
|
2006 |
Duwayri Z, Mollaghasemi M, Nazzal D, Rabadi G. Scheduling setup changes at bottleneck workstations in semiconductor manufacturing Production Planning and Control. 17: 717-727. DOI: 10.1080/09537280600901426 |
0.388 |
|
2006 |
Rabadi G, Moraga RJ, Al-Salem A. Heuristics for the unrelated parallel machine scheduling problem with setup times Journal of Intelligent Manufacturing. 17: 85-97. DOI: 10.1007/S10845-005-5514-0 |
0.578 |
|
2005 |
Arnaout JPM, Rabadi G. Minimizing the total weighted completion time on unrelated parallel machines with stochastic times Proceedings - Winter Simulation Conference. 2005: 2141-2147. DOI: 10.1109/WSC.2005.1574499 |
0.436 |
|
2005 |
Correa-Martinez YC, Bedoya-Valencia L, Arnaout JP, Rabadi G, Ardalan A. Scheduling policies in an assembly environment with earliness and tardiness 26th Annual National Conference of the American Society For Engineering Management 2005 - Organizational Transformation: Opportunities and Challenges, Asem 2005. 156-161. |
0.819 |
|
2004 |
Rabadi G, Mollaghasemi M, Anagnostopoulos GC. A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time Computers and Operations Research. 31: 1727-1751. DOI: 10.1016/S0305-0548(03)00117-5 |
0.56 |
|
2003 |
Valencia LB, Rabadi G. A multiagents approach for the job shop scheduling problem with earliness and tardiness Proceedings of the Ieee International Conference On Systems, Man and Cybernetics. 2: 1217-1222. |
0.436 |
|
2002 |
Anagnostopoulos GC, Rabadi G. A simulated annealing algorithm for the unrelated parallel machine scheduling problem Robotics, Automation, Control and Manufacturing: Trends, Principles and Applications - Proceedings of the 5th Biannual World Automation Congress, Wac 2002, Isora 2002, Isiac 2002 and Isoma 2002. 14: 115-120. |
0.537 |
|
Show low-probability matches. |