Year |
Citation |
Score |
2020 |
Shrestha PP. Legal Issues and Lessons Learned with Project Delivery Systems Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 2020002. DOI: 10.1061/(Asce)La.1943-4170.0000410 |
0.39 |
|
2020 |
Shrestha PP, Davis B, Gad GM. Investigation of Legal Issues in Construction-Manager-at-Risk Projects: Case Study of Airport Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4520022. DOI: 10.1061/(Asce)La.1943-4170.0000404 |
0.613 |
|
2020 |
Kisi KP, Kayastha R, Shrestha PP. Back Charges in Construction Contract: Case Study of Airport Project Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 5020010. DOI: 10.1061/(Asce)La.1943-4170.0000392 |
0.329 |
|
2020 |
Shrestha K, Shrestha PP. Framework Development of Performance-Based Striping Maintenance Contracts Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4520014. DOI: 10.1061/(Asce)La.1943-4170.0000385 |
0.368 |
|
2020 |
Shrestha PP, Batista J. Lessons Learned in Design-Build and Construction-Manager-at-Risk Water and Wastewater Project Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 04520002. DOI: 10.1061/(Asce)La.1943-4170.0000376 |
0.481 |
|
2020 |
Shrestha PP, Neupane KP. Identification of Geotechnical-Related Problems Impacting Cost, Schedule, and Claims on Bridge Construction Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4520005. DOI: 10.1061/(Asce)La.1943-4170.0000375 |
0.487 |
|
2020 |
Gad GM, Davis B, Shrestha PP, Fathi M. Legal and Contractual Issues in Lump-Sum Design-Build Implementation on Large-Scale Airport Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 5019011. DOI: 10.1061/(Asce)La.1943-4170.0000364 |
0.597 |
|
2020 |
Fathi M, Shrestha PP, Shakya B. Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 12: 4519043. DOI: 10.1061/(Asce)La.1943-4170.0000353 |
0.592 |
|
2019 |
Shrestha K, Shrestha PP, Lidder M. Life-Cycle Cost Comparison of Chip Seal and Striping: In-House Workers versus Private Contractors Engineering, Construction and Architectural Management. 26: 1. DOI: 10.1108/Ecam-07-2018-0314 |
0.422 |
|
2019 |
Shrestha PP, Shrestha KK, Zeleke HB. Probability of Change Orders and the Effect on Cost and Schedule for New Public School Buildings Engineering, Construction and Architectural Management. 26: 1087-1104. DOI: 10.1108/Ecam-01-2018-0017 |
0.478 |
|
2019 |
Shrestha PP, Maharjan R, Batista JR. Performance of Design-Build and Construction Manager-at-Risk Methods in Water and Wastewater Projects Practice Periodical On Structural Design and Construction. 24: 04018029. DOI: 10.1061/(Asce)Sc.1943-5576.0000398 |
0.504 |
|
2019 |
Shrestha PP, Maharjan R. Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 11: 4519025. DOI: 10.1061/(Asce)La.1943-4170.0000323 |
0.557 |
|
2019 |
Gad GM, Davis B, Shrestha PP, Harder P. Lessons Learned from Progressive Design-Build Implementation on Airport Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 11: 4519020. DOI: 10.1061/(Asce)La.1943-4170.0000320 |
0.569 |
|
2019 |
Shrestha PP, Fathi M. Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 11: 4519010. DOI: 10.1061/(Asce)La.1943-4170.0000311 |
0.613 |
|
2019 |
Shrestha KK, Shrestha PP. Change Orders on Road Maintenance Contracts: Causes and Preventive Measures Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 11: 4519009. DOI: 10.1061/(Asce)La.1943-4170.0000299 |
0.405 |
|
2018 |
Shrestha PP, Zeleke H. Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 10: 4518018. DOI: 10.1061/(Asce)La.1943-4170.0000271 |
0.515 |
|
2018 |
Shrestha PP, Maharjan R. Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 10: 4518012. DOI: 10.1061/(Asce)La.1943-4170.0000264 |
0.485 |
|
2017 |
Shrestha PP, Shrestha KK, Kandie TK. Effects of Change Orders on the Cost and Schedule of Rural Road Maintenance Projects Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. 9: 4517010. DOI: 10.1061/(Asce)La.1943-4170.0000227 |
0.554 |
|
2017 |
Shrestha PP, Shrestha K, Said AM, Lidder M. Factors Affecting the Selection of In-House and Outsourcing Road Maintenance Methods and Assessment of Their Benefits Journal of Infrastructure Systems. 23: 6016001. DOI: 10.1061/(Asce)Is.1943-555X.0000315 |
0.36 |
|
2017 |
Shrestha PP, Fernane JD. Performance of Design-Build and Design-Bid-Build Projects for Public Universities Journal of Construction Engineering and Management-Asce. 143: 4016101. DOI: 10.1061/(Asce)Co.1943-7862.0001241 |
0.656 |
|
2016 |
Merrill SJ, Paz A, Molano V, Shrestha PP, Maheshwari P, Stephen H, de la Fuente-Mella H. The Feasibility of a Land Ferry System to Reduce Highway Maintenance Cost and Associated Externalities. Thescientificworldjournal. 2016: 8180232. PMID 27419201 DOI: 10.1155/2016/8180232 |
0.378 |
|
2016 |
Shrestha PP, Sharma R, Karakouzian M, Singh A. Comparing Performance and Impediments of Construction and Professional Disadvantaged Business Enterprises in Transportation Journal of Professional Issues in Engineering Education and Practice. 142. DOI: 10.1061/(Asce)Ei.1943-5541.0000267 |
0.303 |
|
2016 |
Shrestha PP, Mulepati S. Energy Performance of a Solar Home Constructed for the Solar Decathlon Competition 2013 Procedia Engineering. 145: 1298-1305. DOI: 10.1016/J.Proeng.2016.04.167 |
0.331 |
|
2016 |
Shrestha PP, Batista J, Maharjan R. Risks Involved in Using Alternative Project Delivery (APD) Methods in Water and Wastewater Projects Procedia Engineering. 145: 219-223. DOI: 10.1016/J.Proeng.2016.04.064 |
0.567 |
|
2016 |
Shrestha KK, Shrestha PP. A Contingency Cost Estimation System for Road Maintenance Contracts Procedia Engineering. 145: 128-135. DOI: 10.1016/J.Proeng.2016.04.030 |
0.453 |
|
2015 |
Shrestha PP, Maharajan R, Batista JR, Shakya B. Comparison of Utility Managers’ and Project Managers’ Satisfaction Rating of Alternative Project Delivery Methods Used in Water and Wastewater Infrastructures Public Works Management and Policy. 21: 263-279. DOI: 10.1177/1087724X15626716 |
0.56 |
|
2015 |
Shrestha K, Shrestha PP, Bajracharya D, Yfantis EA. Hard-Hat Detection for Construction Safety Visualization Journal of Construction Engineering. 2015: 1-8. DOI: 10.1155/2015/721380 |
0.318 |
|
2014 |
Shrestha PP, Maharjan R, Shakya B, Batista J. Alternative project delivery methods for water and wastewater projects: The satisfaction level of owners Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 1733-1742. DOI: 10.1061/9780784413517.0177 |
0.469 |
|
2014 |
Shrestha PP, Mani N. Impact of design cost on project performance of design-bid-build road projects Journal of Management in Engineering. 30. DOI: 10.1061/(Asce)Me.1943-5479.0000220 |
0.644 |
|
2014 |
Shrestha PP, Pradhananga N, Mani N. Correlating the quantity and bid cost of unit price items for public road projects Ksce Journal of Civil Engineering. 18: 1590-1598. DOI: 10.1007/S12205-014-0445-Y |
0.565 |
|
2013 |
Shrestha PP, Burns LA, Shields DR. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects Journal of Construction Engineering. 2013: 1-9. DOI: 10.1155/2013/935978 |
0.599 |
|
2013 |
Shrestha PP, Zeleke HB, Shrestha KK. An analysis of change orders in public school projects Proceedings, Annual Conference - Canadian Society For Civil Engineering. 1: 700-709. |
0.501 |
|
2012 |
Shrestha PP, Pushpala N. Green and Non-Green School Buildings: An empirical comparison of construction cost and schedule Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 1820-1829. DOI: 10.1061/9780784412329.183 |
0.364 |
|
2012 |
Shrestha PP, Mani N. Impact of design cost on design bid build project performance Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. 1570-1579. DOI: 10.1061/9780784412329.158 |
0.484 |
|
2012 |
Shrestha PP, O'Connor JT, Gibson GE. Performance comparison of large design-build and design-bid-build highway projects Journal of Construction Engineering and Management. 138: 1-13. DOI: 10.1061/(Asce)Co.1943-7862.0000390 |
0.722 |
|
2010 |
Shrestha PP, Pradhananga N. Correlating bid price with the number of bidders and final construction cost of public street projects Transportation Research Record. 3-10. DOI: 10.3141/2151-01 |
0.543 |
|
2009 |
Shrestha PP, Pradhananga N. GIS-based road maintenance management Proceedings of the 2009 Asce International Workshop On Computing in Civil Engineering. 346: 472-484. DOI: 10.1061/41052(346)47 |
0.322 |
|
2009 |
Migliaccio GC, Shrestha PP. Analysis of design-build procurement activities durations for highway projects Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 229-238. DOI: 10.1061/41020(339)24 |
0.709 |
|
2009 |
Hale DR, Shrestha PP, Gibson GE, Migliaccio GC. Empirical comparison of design/build and design/bid/build project delivery methods Journal of Construction Engineering and Management. 135: 579-587. DOI: 10.1061/(Asce)Co.1943-7862.0000017 |
0.714 |
|
2007 |
Shrestha PP, Migliaccio GC, O'Connor JT, Gibson GE. Benchmarking of large design-build highway projects one-to-one comparison and comparison with design-bid-build projects Transportation Research Record. 17-25. DOI: 10.3141/1994-03 |
0.721 |
|
2005 |
Cross SA, Voth MD, Shrestha PP. Guidelines for prime coat usage on low-volume roads Transportation Research Record. 117-125. DOI: 10.3141/1913-12 |
0.386 |
|
Show low-probability matches. |