Xiangyu Wang, Ph.D. - Publications

Affiliations: 
2005 Purdue University, West Lafayette, IN, United States 
Area:
Civil Engineering, Cognitive Psychology

95 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Zhu J, Wu P, Chen M, Kim MJ, Wang X, Fang T. Automatically Processing IFC Clipping Representation for BIM and GIS Integration at the Process Level Applied Sciences. 10: 2009. DOI: 10.3390/App10062009  0.328
2020 Wang X, Yew AWW, Ong SK, Nee AYC. Enhancing smart shop floor management with ubiquitous augmented reality International Journal of Production Research. 58: 2352-2367. DOI: 10.1080/00207543.2019.1629667  0.318
2020 Ong SK, Wang X, Nee AYC. 3D bare-hand interactions enabling ubiquitous interactions with smart objects Advances in Manufacturing. 8: 133-143. DOI: 10.1007/S40436-020-00295-1  0.327
2019 Peng H, Wang W, Xiang C, Li L, Wang X. Torque Coordinated Control of Four In-Wheel Motor Independent-Drive Vehicles With Consideration of the Safety and Economy Ieee Transactions On Vehicular Technology. 68: 9604-9618. DOI: 10.1109/Tvt.2019.2935617  0.304
2019 Huang C, Wang X, Li L, Chen X. Multistructure Radial Basis Function Neural-Networks-Based Extended Model Predictive Control: Application to Clutch Control Ieee-Asme Transactions On Mechatronics. 24: 2519-2530. DOI: 10.1109/Tmech.2019.2949001  0.318
2019 Hammad AW, Akbarnezhad A, Wu P, Wang X, Haddad A. Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors Journal of Cleaner Production. 228: 1264-1281. DOI: 10.1016/J.Jclepro.2019.04.150  0.336
2019 Hu X, Chong H, Wang X. Sustainability perceptions of off-site manufacturing stakeholders in Australia Journal of Cleaner Production. 227: 346-354. DOI: 10.1016/J.Jclepro.2019.03.258  0.32
2019 Zhu J, Wang X, Chen M, Wu P, Kim MJ. Integration of BIM and GIS: IFC geometry transformation to shapefile using enhanced open-source approach Automation in Construction. 106: 102859. DOI: 10.1016/J.Autcon.2019.102859  0.322
2019 Zhu J, Wang X, Wang P, Wu Z, Kim MJ. Integration of BIM and GIS: Geometry from IFC to shapefile using open-source technology Automation in Construction. 102: 105-119. DOI: 10.1016/J.Autcon.2019.02.014  0.312
2018 Wang P, Wu P, Wang J, Chi HL, Wang X. A Critical Review of the Use of Virtual Reality in Construction Engineering Education and Training. International Journal of Environmental Research and Public Health. 15. PMID 29890627 DOI: 10.3390/Ijerph15061204  0.312
2018 Wang J, Chi H, Shou W, Chong H, Wang X. A Coordinated Approach for Supply-Chain Tracking in the Liquefied Natural Gas Industry Sustainability. 10: 4822. DOI: 10.3390/Su10124822  0.312
2018 Wu P, Song Y, Hu X, Wang X. A Preliminary Investigation of the Transition from Green Building to Green Community: Insights from LEED ND Sustainability. 10: 1802. DOI: 10.3390/Su10061802  0.323
2018 Mirarchi C, Pavan A, Marco FD, Wang X, Song Y. Supporting Facility Management Processes through End-Users’ Integration and Coordinated BIM-GIS Technologies Isprs International Journal of Geo-Information. 7: 191. DOI: 10.3390/Ijgi7050191  0.348
2018 Zhu J, Wright G, Wang J, Wang X. A Critical Review of the Integration of Geographic Information System and Building Information Modelling at the Data Level Isprs International Journal of Geo-Information. 7: 66. DOI: 10.3390/Ijgi7020066  0.301
2018 Liang R, Sheng Z, Wang X. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects Complexity. 2018: 1-14. DOI: 10.1155/2018/8705134  0.31
2018 Liu B, Li L, Wang X, Cheng S. Hybrid Electric Vehicle Downshifting Strategy Based on Stochastic Dynamic Programming During Regenerative Braking Process Ieee Transactions On Vehicular Technology. 67: 4716-4727. DOI: 10.1109/Tvt.2018.2815518  0.302
2018 Lee CY, Chong H, Wang X. Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model Journal of Construction Engineering and Management. 144: 06018002. DOI: 10.1061/(Asce)Co.1943-7862.0001521  0.328
2018 Moon S, Xu S, Hou L, Wu C, Wang X, Tam VWY. RFID-aided tracking system to improve work efficiency of scaffold supplier: stock management in Australasian supply chain Journal of Construction Engineering and Management-Asce. 144: 4017115. DOI: 10.1061/(Asce)Co.1943-7862.0001432  0.344
2018 Huang B, Wang X, Kua H, Geng Y, Bleischwitz R, Ren J. Construction and demolition waste management in China through the 3R principle Resources, Conservation and Recycling. 129: 36-44. DOI: 10.1016/J.Resconrec.2017.09.029  0.32
2018 Tan Y, Song Y, Zhu J, Long Q, Wang X, Cheng JCP. Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS Automation in Construction. 94: 328-339. DOI: 10.1016/J.Autcon.2018.07.012  0.317
2018 Porter S, Tan T, Wang X, Pareek V. LODOS - Going from BIM to CFD via CAD and model abstraction Automation in Construction. 94: 85-92. DOI: 10.1016/J.Autcon.2018.06.001  0.335
2018 Lu H, Wang H, Xie Y, Wang X. Study on construction material allocation policies: A simulation optimization method Automation in Construction. 90: 201-212. DOI: 10.1016/J.Autcon.2018.02.012  0.321
2018 Cheng JCP, Tan Y, Song Y, Mei Z, Gan VJL, Wang X. Developing an evacuation evaluation model for offshore oil and gas platforms using BIM and agent-based model Automation in Construction. 89: 214-224. DOI: 10.1016/J.Autcon.2018.02.011  0.32
2018 Li X, Yi W, Chi H, Wang X, Chan APC. A critical review of virtual and augmented reality (VR/AR) applications in construction safety Automation in Construction. 86: 150-162. DOI: 10.1016/J.Autcon.2017.11.003  0.312
2018 Lee C, Chong H, Wang X. Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects Archives of Computational Methods in Engineering. 25: 349-396. DOI: 10.1007/S11831-016-9201-4  0.31
2017 LOPEZ R, CHONG H, MOON S, WANG X. CASE STUDY ON SUBCONTRACTING ARRANGEMENTS IN THE SCAFFOLDING SUPPLY CHAIN OF A LIQUEFIED NATURAL GAS INFRASTRUCTURE PROJECT Journal of Civil Engineering and Management. 23: 1136-1147. DOI: 10.3846/13923730.2017.1388277  0.324
2017 Wang T, Zhang Q, Chong H, Wang X. Integrated Supplier Selection Framework in a Resilient Construction Supply Chain: An Approach via Analytic Hierarchy Process (AHP) and Grey Relational Analysis (GRA) Sustainability. 9: 289. DOI: 10.3390/Su9020289  0.315
2017 Wu P, Song Y, Wang J, Wang X, Zhao X, He Q. Regional Variations of Credits Obtained by LEED 2009 Certified Green Buildings—A Country Level Analysis Sustainability. 10: 20. DOI: 10.3390/Su10010020  0.307
2017 Song Y, Wang X, Tan Y, Wu P, Sutrisna M, Cheng JCP, Hampson K. Trends and Opportunities of BIM-GIS Integration in the Architecture, Engineering and Construction Industry: A Review from a Spatio-Temporal Statistical Perspective Isprs International Journal of Geo-Information. 6: 397. DOI: 10.3390/Ijgi6120397  0.338
2017 Liu X, Wang X, Wright G, Cheng JCP, Li X, Liu R. A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS) Isprs International Journal of Geo-Information. 6: 53. DOI: 10.3390/Ijgi6020053  0.332
2017 Teng Y, Li X, Wu P, Wang X. Using cooperative game theory to determine profit distribution in IPD projects International Journal of Construction Management. 19: 32-45. DOI: 10.1080/15623599.2017.1358075  0.3
2017 Hou L, Zhao C, Wu C, Moon S, Wang X. Discrete Firefly Algorithm for Scaffolding Construction Scheduling Journal of Computing in Civil Engineering. 31: 1-15. DOI: 10.1061/(Asce)Cp.1943-5487.0000639  0.329
2017 Li L, Wang X, Song J. Fuel consumption optimization for smart hybrid electric vehicle during a car-following process Mechanical Systems and Signal Processing. 87: 17-29. DOI: 10.1016/J.Ymssp.2016.03.002  0.302
2017 Teng Y, Mao C, Liu G, Wang X. Analysis of stakeholder relationships in the industry chain of industrialized building in China Journal of Cleaner Production. 152: 387-398. DOI: 10.1016/J.Jclepro.2017.03.094  0.326
2017 Chong H, Lee C, Wang X. A mixed review of the adoption of Building Information Modelling (BIM) for sustainability Journal of Cleaner Production. 142: 4114-4126. DOI: 10.1016/J.Jclepro.2016.09.222  0.344
2017 Mancini M, Wang X, Skitmore M, Issa R. Editorial for IJPM special issue on advances in building information modeling (BIM) for construction projects International Journal of Project Management. 35: 656-657. DOI: 10.1016/J.Ijproman.2016.12.008  0.342
2017 Li X, Wu P, Shen GQ, Wang X, Teng Y. Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach Automation in Construction. 84: 195-206. DOI: 10.1016/J.Autcon.2017.09.011  0.342
2017 Hou L, Chi H, Tarng W, Chai J, Panuwatwanich K, Wang X. A framework of innovative learning for skill development in complex operational tasks Automation in Construction. 83: 29-40. DOI: 10.1016/J.Autcon.2017.07.001  0.313
2017 Tan Y, Song Y, Liu X, Wang X, Cheng JCP. A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms Automation in Construction. 79: 19-30. DOI: 10.1016/J.Autcon.2017.02.008  0.335
2017 Zhao C, Wu C, Chai J, Wang X, Yang X, Lee J, Kim MJ. Decomposition-based multi-objective firefly algorithm for RFID network planning with uncertainty Applied Soft Computing. 55: 549-564. DOI: 10.1016/J.Asoc.2017.02.009  0.307
2017 Yang Y, Zhu Z, Wang X, Chen Z, Ma Z. Optimal launching-intention-aware control strategy for automated clutch engagement International Journal of Automotive Technology. 18: 417-428. DOI: 10.1007/S12239-017-0042-4  0.313
2016 Chai J, Chi H, Wang X, Wu C, Jung KH, Lee JM. Automatic as-built modeling for concurrent progress tracking of plant construction based on laser scanning Concurrent Engineering. 24: 369-380. DOI: 10.1177/1063293X16670449  0.316
2016 Li L, Zhu Z, Chen Y, He K, Li X, Wang X. Engagement Control of Automated Clutch for Vehicle Launching Considering the Instantaneous Changes of Driver's Intention Journal of Dynamic Systems, Measurement, and Control. 139. DOI: 10.1115/1.4034841  0.301
2016 Wang J, Shou W, Wang X, Wu P. Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction Construction Management and Economics. 1-16. DOI: 10.1080/01446193.2016.1227460  0.356
2016 Chong HY, Lopez R, Wang J, Wang X, Zhao Z. Comparative Analysis on the Adoption and Use of BIM in Road Infrastructure Projects Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000460  0.308
2016 Moon S, Forlani J, Wang X, Tam V. Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia Journal of Professional Issues in Engineering Education and Practice. 142. DOI: 10.1061/(Asce)Ei.1943-5541.0000287  0.308
2016 Lopez R, Chong HY, Wang X, Graham J. Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001094  0.326
2016 Mao C, Xie F, Hou L, Wu P, Wang J, Wang X. Cost analysis for sustainable off-site construction based on a multiple-case study in China Habitat International. 57: 215-222. DOI: 10.1016/J.Habitatint.2016.08.002  0.324
2016 Wu P, Wang J, Wang X. A critical review of the use of 3-D printing in the construction industry Automation in Construction. 68: 21-31. DOI: 10.1016/J.Autcon.2016.04.005  0.321
2016 Wang J, Wang X, Shou W, Chong HY, Guo J. Building information modeling-based integration of MEP layout designs and constructability Automation in Construction. 61: 134-146. DOI: 10.1016/J.Autcon.2015.10.003  0.341
2016 Li L, Li X, Wang X, Song J, He K, Li C. Analysis of downshift's improvement to energy efficiency of an electric vehicle during regenerative braking Applied Energy. 176: 125-137. DOI: 10.1016/J.Apenergy.2016.05.042  0.309
2016 Wang X, Ong S, Nee A. Multi-modal augmented-reality assembly guidance based on bare-hand interface Advanced Engineering Informatics. 30: 406-421. DOI: 10.1016/J.Aei.2016.05.004  0.312
2016 Wang X, Ong SK, Nee AYC. A comprehensive survey of augmented reality assembly research Advances in Manufacturing. 4: 1-22. DOI: 10.1007/S40436-015-0131-4  0.322
2016 Chong HY, Wang X. The outlook of building information modeling for sustainable development Clean Technologies and Environmental Policy. 1-11. DOI: 10.1007/S10098-016-1170-7  0.35
2015 Kim MJ, Wang X, Han S, Wang Y. Implementing an augmented reality-enabled wayfinding system through studying user experience and requirements in complex environments Visualization in Engineering. 3. DOI: 10.1186/S40327-015-0026-2  0.314
2015 Tavakoli Taba S, Rahnamayie Zekavat P, Alipour Esgandani G, Wang X, Bernold L. A multidimensional analytical approach for identifying and locating large utility pipes in underground infrastructure International Journal of Distributed Sensor Networks. 2015. DOI: 10.1155/2015/601859  0.304
2015 Wang X, Chong HY. Setting new trends of integrated Building Information Modelling (BIM) for construction industry Construction Innovation. 15: 2-6. DOI: 10.1108/Ci-10-2014-0049  0.344
2015 Wang X, Ong SK, Nee AYC. Real-virtual interaction in AR assembly simulation based on component contact handling strategy Assembly Automation. 35: 376-394. DOI: 10.1108/Aa-02-2015-012  0.333
2015 Hou L, Wang X, Truijens M. Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation Journal of Computing in Civil Engineering. 29: 5014007. DOI: 10.1061/(Asce)Cp.1943-5487.0000344  0.329
2015 Wang J, Zhang X, Shou W, Wang X, Xu B, Kim MJ, Wu P. A BIM-based approach for automated tower crane layout planning Automation in Construction. 59: 168-178. DOI: 10.1016/J.Autcon.2015.05.006  0.352
2015 Zhou Y, Ding L, Wang X, Truijens M, Luo H. Applicability of 4D modeling for resource allocation in mega liquefied natural gas plant construction Automation in Construction. 50: 50-63. DOI: 10.1016/J.Autcon.2014.10.016  0.335
2015 Chi HL, Wang X, Jiao Y. BIM-Enabled Structural Design: Impacts and Future Developments in Structural Modelling, Analysis and Optimisation Processes Archives of Computational Methods in Engineering. 22: 135-151. DOI: 10.1007/S11831-014-9127-7  0.313
2015 Shou W, Wang J, Wang X, Chong HY. A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries Archives of Computational Methods in Engineering. 22: 291-308. DOI: 10.1007/S11831-014-9125-9  0.346
2015 Chi HL, Wang J, Wang X, Truijens M, Yung P. A Conceptual Framework of Quality-Assured Fabrication, Delivery and Installation Processes for Liquefied Natural Gas (LNG) Plant Construction Journal of Intelligent and Robotic Systems: Theory and Applications. 79: 433-448. DOI: 10.1007/S10846-014-0123-9  0.351
2014 Kang S, Ding L, Wang X. Editorial on Robotics in Building and Infrastructure International Journal of Advanced Robotic Systems. 11: 134. DOI: 10.5772/58747  0.319
2014 Li J, Hou L, Wang X, Wang J, Guo J, Zhang S, Jiao Y. A project-based quantification of BIM benefits International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58448  0.352
2014 Li J, Wang Y, Wang X, Luo H, Kang SC, Wang J, Guo J, Jiao Y. Benefits of building information modelling in the project lifecycle: Construction projects in asia International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58447  0.359
2014 Yung P, Wang X. A 6D CAD model for the automatic assessment of building sustainability International Journal of Advanced Robotic Systems. 11. DOI: 10.5772/58446  0.316
2014 Sohn HW, Hong WK, Lee D, Lim C, Wang X, Kim S. Optimum Tower Crane Selection and Supporting Design Management International Journal of Advanced Robotic Systems. 11: 133. DOI: 10.5772/58438  0.32
2014 Wang J, Wang X, Shou W, Xu B. Integrating BIM and augmented reality for interactive architectural visualisation Construction Innovation. 14: 453-476. DOI: 10.1108/Ci-03-2014-0019  0.326
2014 Dunston PS, Proctor RW, Wang X. Challenges in evaluating skill transfer from construction equipment simulators Theoretical Issues in Ergonomics Science. 15: 354-375. DOI: 10.1080/1463922X.2011.624647  0.647
2014 Wang J, Wang X, Shou W, Guo J, Hou L. Development of BIM model fitness review system for modelling quality control Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 577-584. DOI: 10.1061/9780784413616.072  0.32
2014 Shou W, Wang X, Wang J, Hou L, Truijens M. Integration of BIM and lean concepts to improve maintenance efficiency: A case study Computing in Civil and Building Engineering - Proceedings of the 2014 International Conference On Computing in Civil and Building Engineering. 373-380. DOI: 10.1061/9780784413616.047  0.327
2014 Wang X, Love PE, Kim MJ, Wang W. Mutual awareness in collaborative design: An Augmented Reality integrated telepresence system Computers in Industry. 65: 314-324. DOI: 10.1016/J.Compind.2013.11.012  0.303
2014 Wang X, Yung P, Luo H, Truijens M. An innovative method for project control in LNG project through 5D CAD: A case study Automation in Construction. 45: 126-135. DOI: 10.1016/J.Autcon.2014.05.011  0.311
2014 Wang X, Truijens M, Hou L, Wang Y, Zhou Y. Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry Automation in Construction. 40: 96-105. DOI: 10.1016/J.Autcon.2013.12.003  0.344
2014 Wang J, Sun W, Shou W, Wang X, Wu C, Chong HY, Liu Y, Sun C. Integrating BIM and LiDAR for Real-Time Construction Quality Control Journal of Intelligent and Robotic Systems: Theory and Applications. 79: 417-432. DOI: 10.1007/S10846-014-0116-8  0.316
2013 Proctor RW, Dunston PS, So JC, Lopez-Santamaria BN, Yamaguchi M, Wang X. Specificity of transfer in basic and applied perceptual-motor tasks. The American Journal of Psychology. 126: 401-15. PMID 24455808 DOI: 10.5406/Amerjpsyc.126.4.0401  0.633
2013 So JC, Proctor RW, Dunston PS, Wang X. Better retention of skill operating a simulated hydraulic excavator after part-task than after whole-task training. Human Factors. 55: 449-60. PMID 23691837 DOI: 10.1177/0018720812454292  0.623
2013 Wang X, Dunston PS. Tangible mixed reality for remote design review: a study understanding user perception and acceptance Visualization in Engineering. 1. DOI: 10.1186/2213-7459-1-8  0.652
2013 Wang Y, Wang X, Wang J, Yung P, Jun G. Engagement of facilities management in design stage through BIM: Framework and a case study Advances in Civil Engineering. 2013. DOI: 10.1155/2013/189105  0.318
2013 Hou L, Wang X, Bernold L, Love PED. Using animated augmented reality to cognitively guide assembly Journal of Computing in Civil Engineering. 27: 439-451. DOI: 10.1061/(Asce)Cp.1943-5487.0000184  0.308
2013 Su X, Dunston PS, Proctor RW, Wang X. Influence of training schedule on development of perceptual-motor control skills for construction equipment operators in a virtual training system Automation in Construction. 35: 439-447. DOI: 10.1016/J.Autcon.2013.05.029  0.646
2013 Chi H, Kang S, Wang X. Research trends and opportunities of augmented reality applications in architecture, engineering, and construction Automation in Construction. 33: 116-122. DOI: 10.1016/J.Autcon.2012.12.017  0.304
2013 Wang X, Love PED, Kim MJ, Park C, Sing C, Hou L. A conceptual framework for integrating building information modeling with augmented reality Automation in Construction. 34: 37-44. DOI: 10.1016/J.Autcon.2012.10.012  0.353
2011 Wang R, Wang X, Kim MJ. Motivated learning agent model for distributed collaborative systems Expert Systems With Applications. 38: 1079-1088. DOI: 10.1016/J.Eswa.2010.05.003  0.3
2011 Rezazadeh IM, Wang X, Firoozabadi M, Golpayegani MRH. Using affective human-machine interface to increase the operation performance in virtual construction crane training system: A novel approach Automation in Construction. 20: 289-298. DOI: 10.1016/J.Autcon.2010.10.005  0.336
2011 Singh V, Gu N, Wang X. A theoretical framework of a BIM-based multi-disciplinary collaboration platform Automation in Construction. 20: 134-144. DOI: 10.1016/J.Autcon.2010.09.011  0.38
2009 Dong A, Maher ML, Kim MJ, Gu N, Wang X. Construction defect management using a telematic digital workbench Automation in Construction. 18: 814-824. DOI: 10.1016/J.Autcon.2009.03.005  0.317
2008 Wang X, Chen R. An empirical study on augmented virtuality space for tele-inspection inspection of built environments Tsinghua Science & Technology. 13: 286-291. DOI: 10.1016/S1007-0214(08)70163-9  0.332
2008 Wang X, Dunston PS. User perspectives on mixed reality tabletop visualization for face-to-face collaborative design review Automation in Construction. 17: 399-412. DOI: 10.1016/J.Autcon.2007.07.002  0.653
2007 Wang X. Using Augmented Reality to Plan Virtual Construction Worksite International Journal of Advanced Robotic Systems. 4: 42. DOI: 10.5772/5677  0.327
2006 Wang X, Dunston PS. Potential of augmented reality as an assistant viewer for computer-aided drawing Journal of Computing in Civil Engineering. 20: 437-441. DOI: 10.1061/(Asce)0887-3801(2006)20:6(437)  0.648
2006 Wang X, Dunston PS. Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study Automation in Construction. 15: 314-326. DOI: 10.1016/J.Autcon.2005.06.002  0.649
2005 Dunston PS, Wang X. Mixed Reality-based visualization interfaces for architecture, engineering, and construction industry Journal of Construction Engineering and Management. 131: 1301-1309. DOI: 10.1061/(Asce)0733-9364(2005)131:12(1301)  0.665
Show low-probability matches.