Year |
Citation |
Score |
2019 |
Zhang R, Xing J, Ye K, Lu W, Shan Y. Synchronicity of global construction cost indexes Engineering, Construction and Architectural Management. 26: 367-385. DOI: 10.1108/Ecam-02-2018-0045 |
0.388 |
|
2019 |
Contreras-Nieto C, Shan Y, Lewis P, Hartell JA. Bridge maintenance prioritization using analytic hierarchy process and fusion tables Automation in Construction. 101: 99-110. DOI: 10.1016/J.Autcon.2019.01.016 |
0.314 |
|
2017 |
Albattah M, Shan Y, Goodrum PM, Taylor TRB. Relationships between cycles of economic expansion in construction and craft workers’ job satisfaction and preferences Canadian Journal of Civil Engineering. 44: 29-36. DOI: 10.1139/Cjce-2016-0358 |
0.577 |
|
2017 |
Shan Y, Imran H, Lewis P, Zhai D. Investigating the Latent Factors of Quality of Work-Life Affecting Construction Craft Worker Job Satisfaction Journal of Construction Engineering and Management-Asce. 143: 4016134. DOI: 10.1061/(Asce)Co.1943-7862.0001281 |
0.322 |
|
2016 |
Zhai D, Shan Y, Sturgill RE, Taylor TRB, Goodrum PM. Using parametric modeling to estimate highway construction contract time Transportation Research Record. 2573: 1-9. DOI: 10.3141/2573-01 |
0.582 |
|
2016 |
Shan Y, Zhai D, Goodrum PM, Haas CT, Caldas CH. Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000375 |
0.641 |
|
2016 |
Lewis P, Khaleghian H, Shan Y. Development of a Sustainable National Sewer Inventory Procedia Engineering. 145: 1410-1415. DOI: 10.1016/J.Proeng.2016.04.177 |
0.357 |
|
2015 |
Ye K, Zhu W, Shan Y, Li S. Effects of Market Competition on the Sustainability Performance of the Construction Industry: China Case Journal of Construction Engineering and Management-Asce. 141: 4015025. DOI: 10.1061/(Asce)Co.1943-7862.0000999 |
0.37 |
|
2015 |
Lewis P, Shan Y, Hazzard E. Sustainability Planning Framework for Reducing Ground-level Ozone Formation in Construction Activities Procedia Engineering. 118: 766-773. DOI: 10.1016/J.Proeng.2015.08.512 |
0.32 |
|
2014 |
Shan Y, Goodrum PM. Integration of Building Information Modeling and Critical Path Method Schedules to Simulate the Impact of Temperature and Humidity at the Project Level Buildings. 4: 295-319. DOI: 10.3390/Buildings4030295 |
0.458 |
|
2014 |
Shan Y, Kim JY, Goodrum PM, Caldas CH, Haas C. Impact of steel quick connection system on steel erection labor productivity: Case studies and simulation based analyses Canadian Journal of Civil Engineering. 41: 1036-1045. DOI: 10.1139/Cjce-2014-0079 |
0.602 |
|
2012 |
Taylor TRB, Uddin M, Goodrum PM, McCoy A, Shan Y. Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects Journal of Construction Engineering and Management. 138: 1360-1369. DOI: 10.1061/(Asce)Co.1943-7862.0000550 |
0.607 |
|
2011 |
Shan Y, Goodrum PM, Zhai D, Haas C, Caldas CH. The impact of management practices on mechanical construction productivity Construction Management and Economics. 29: 305-316. DOI: 10.1080/01446193.2010.538070 |
0.63 |
|
2010 |
Jones T, Shan Y, Goodrum PM. An investigation of corporate approaches to sustainability in the US engineering and construction industry Construction Management and Economics. 28: 971-983. DOI: 10.1080/01446191003789465 |
0.618 |
|
Show low-probability matches. |