Kim L. Needy - Publications

Affiliations: 
Industrial Engineering University of Arkansas, Little Rock, AR 
Area:
Industrial Engineering, Civil Engineering
Website:
https://industrial-engineering.uark.edu/directory/index/uid/kneedy/name/Kim-Needy/

38 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2019 Alves TdCL, Neuman Y, Walsh KD, Needy KL, AlMaian R. Highly effective companies in supplier quality surveillance practices: a quantitative analysis Construction Management and Economics. 38: 239-258. DOI: 10.1080/01446193.2019.1590613  0.739
2016 Almaian RY, Needy KL, Walsh KD, Da Alves TCL, Scala NM. Analyzing supplier quality management practices in the construction industry Quality Engineering. 28: 175-183. DOI: 10.1080/08982112.2015.1086927  0.767
2016 Alves TDCL, Ravaghi K, Needy KL. Supplier Selection in EPC Projects: An Overview of the Process and Its Main Activities Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 209-218. DOI: 10.1061/9780784479827.022  0.506
2016 Almaian RY, Needy KL, Alves TDCL, Walsh KD. Analyzing Effective Supplier-Quality-Management Practices Using Simple Multiattribute Rating Technique and Value-Focused Thinking Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000364  0.767
2016 AlMaian RY, Needy KL, Walsh KD, Alves TDCL. A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001046  0.769
2016 Scala NM, Rajgopal J, Vargas LG, Needy KL. Group Decision Making with Dispersion in the Analytic Hierarchy Process Group Decision and Negotiation. 25: 355-372. DOI: 10.1007/S10726-015-9445-7  0.31
2015 Claypool EG, Norman BA, Needy KL. Design for Supply Chain: An Analysis of Key Risk Factors Industrial Engineering and Management. 2015: 1-8. DOI: 10.4172/2169-0316.1000156  0.32
2015 Neuman Y, Alves TDCL, Walsh KD, Needy KL. Quantitative Analysis of Supplier Quality Surveillance Practices in EPC Projects Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0001023  0.631
2014 Scala NM, Rajgopal J, Needy KL. Managing nuclear spare parts inventories: A data driven methodology Ieee Transactions On Engineering Management. 61: 28-37. DOI: 10.1109/Tem.2013.2283170  0.438
2014 Ahmad S, Walsh KD, Alves TDCL, Needy KL. An analysis of process v. inspection capabilities in fabricated, engineered-to-order construction supply chains Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 2325-2334. DOI: 10.1061/9780784413517.0236  0.417
2014 Neuman Y, Alves TDCL, Walsh KD, Needy KL, Almaian RY. Analysis of supplier quality surveillance in epc projects 22nd Annual Conference of the International Group For Lean Construction: Understanding and Improving Project Based Production, Iglc 2014. 1083-1094.  0.76
2013 Scala NM, Rajgopal J, Needy KL. A base stock inventory management system for intermittent spare parts Military Operations Research. 18: 63-77. DOI: 10.5711/1082598318363  0.396
2013 AlMaian RY, Needy KL, Walsh KD, Da Alves TCL, Neuman Y. Supplier Quality Management inside and outside the construction industry International Annual Conference of the American Society For Engineering Management 2013, Asem 2013. 90-100. DOI: 10.1080/10429247.2015.11432032  0.756
2013 Da Alves TCL, Walsh KD, Neuman Y, Needy KL, Almaian R. Supplier quality surveillance practices in construction 21st Annual Conference of the International Group For Lean Construction 2013, Iglc 2013. 716-725.  0.545
2010 Bilec MM, Geary M, Ries RJ, Needy KL, Cashion MK. A method for quantifying the benefits of greening a healthcare facility Emj - Engineering Management Journal. 22: 3-11. DOI: 10.1080/10429247.2010.11431867  0.459
2010 Scala NM, Rajgopal J, Needy KL. Influence diagram modeling of nuclear spare parts process Iie Annual Conference and Expo 2010 Proceedings 0.301
2009 Bilec MM, Ries RJ, Needy KL, Gokhan M, Phelps AF, Enache-Pommer E, Horman MJ, Little SE, Powers TL, McGregor E, Sheane C. Analysis of the design process of green children's hospitals: Focus on process modeling and lessons learned Journal of Green Building. 4: 121-134. DOI: 10.3992/Jgb.4.1.121  0.303
2008 Turan FK, Scala NM, Kamrani A, Needy KL. Organizational sustainability: A new project portfolio management approach that integrates financial and non-financial performance measures Iie Annual Conference and Expo 2008. 1025-1030.  0.31
2006 Abdulmalek FA, Rajgopal J, Needy KL. A classification scheme for the process industry to guide the implementation of lean Emj - Engineering Management Journal. 18: 15-25. DOI: 10.1080/10429247.2006.11431690  0.393
2006 Ries R, Bilec MM, Gokhan NM, Needy KL. The economic benefits of green buildings: A comprehensive case study Engineering Economist. 51: 259-295. DOI: 10.1080/00137910600865469  0.403
2006 Adeyemi Y, Needy KL. An analysis of Six Sigma at small vs. large manufacturing companies 2006 Iie Annual Conference and Exhibition 0.344
2006 Rabeneck DR, Snyder P, Nickoloff D, Kassimer D, Needy KL. A case study of the logistical preparations for a reality tv show 27th Annual National Conference of the American Society For Engineering Management 2006 - Managing Change: Managing People and Technology in a Rapidly Changing World, Asem 2006. 387-392.  0.374
2005 Bidanda B, Ariyawongrat P, Needy KL, Norman BA, Tharmmaphornphilas W. Human related issues in manufacturing cell design, implementation, and operation: A review and survey Computers and Industrial Engineering. 48: 507-523. DOI: 10.1016/J.Cie.2003.03.002  0.375
2005 Gross EA, Needy KL, Norman BA. Inventory management in a build-to-order environment Iie Annual Conference and Exposition 2005 0.318
2004 Roztocki N, Porter JD, Thomas RM, Needy KL. A Procedure for Smooth Implementation of Activity-Based Costing in Small Companies Engineering Management Journal. 16: 19-27. DOI: 10.1080/10429247.2004.11415262  0.327
2003 Wilson JP, Walsh MAT, Needy KL. An Examination of the Economic Benefits of ISO 9000 and the Baldrige Award to Manufacturing Firms Engineering Management Journal. 15: 3-10. DOI: 10.1080/10429247.2003.11415220  0.455
2003 Needy KL, Nachtmann H, Roztocki N, Colosimo Warner R, Bidanda B. Implementing activity-based costing systems in small manufacturing firms: A field study Emj - Engineering Management Journal. 15: 3-10. DOI: 10.1080/10429247.2003.11415190  0.406
2002 Needy KL, Norman BA, Bidanda B, Ariyawongrat P, Warner RC. Assessing human capital: A lean manufacturing example Emj - Engineering Management Journal. 14: 35-39. DOI: 10.1080/10429247.2002.11415171  0.373
2002 Norman BA, Tharmmaphornphilas W, Needy KL, Bidanda B, Warner RC. Worker assignment in cellular manufacturing considering technical and human skills International Journal of Production Research. 40: 1479-1492. DOI: 10.1080/00207540110118082  0.339
2002 Needy KL, Bidanda B. Successfully partnering with industry through the industrial engineering senior design project Asee Annual Conference Proceedings. 7873-7880.  0.381
2001 Nachtmann H, Needy KL. Fuzzy Activity Based Costing: A Methodology For Handling Uncertainty In Activity Based Costing Systems The Engineering Economist. 46: 245-273. DOI: 10.1080/00137910108967577  0.32
2000 Needy KL, Bidanda B, Gulsen M. A model to develop, assess, and validate an activity-based costing system for small manufacturers Emj - Engineering Management Journal. 12: 31-38. DOI: 10.1080/10429247.2000.11415061  0.363
2000 Needy KL, Nachtmann H, Lavelle JP, Eschenbach TG. An empirical analysis of engineering economy pedagogy Engineering Economist. 45: 74-92. DOI: 10.1080/00137910008967537  0.326
1999 Roztocki N, Needy KL. Integrating activity-based costing and economic value added in manufacturing Emj - Engineering Management Journal. 11: 17-22. DOI: 10.1080/10429247.1999.11415023  0.364
1999 Needy KL, Cleland DI, Slevin DP, Nachtmann H, Cohen SL. Critical factors in successful corporate governance Asee Annual Conference Proceedings. 1419-1425.  0.365
1998 Billo RE, Needy KL, Barbe TA. The application of automatic identification and checkweigh for automated inspection in cellular assembly Quality Engineering. 10: 427-435. DOI: 10.1080/08982119808919156  0.407
1998 Needy KL, Billo RE, Warner RC. A cost model for the evaluation of alternative cellular manufacturing configurations Computers and Industrial Engineering. 34: 119-134. DOI: 10.1016/S0360-8352(97)00155-1  0.321
1996 Billo RE, Needy KL, Bidanda B. Challenges facing information technology to support world class manufacturing Computers in Industry. 28: 163-165. DOI: 10.1016/0166-3615(95)00041-0  0.444
Show low-probability matches.