Year |
Citation |
Score |
2019 |
Alves TdCL, Neuman Y, Walsh KD, Needy KL, AlMaian R. Highly effective companies in supplier quality surveillance practices: a quantitative analysis Construction Management and Economics. 38: 239-258. DOI: 10.1080/01446193.2019.1590613 |
0.739 |
|
2016 |
Almaian RY, Needy KL, Walsh KD, Da Alves TCL, Scala NM. Analyzing supplier quality management practices in the construction industry Quality Engineering. 28: 175-183. DOI: 10.1080/08982112.2015.1086927 |
0.767 |
|
2016 |
Alves TDCL, Ravaghi K, Needy KL. Supplier Selection in EPC Projects: An Overview of the Process and Its Main Activities Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, Crc 2016. 209-218. DOI: 10.1061/9780784479827.022 |
0.506 |
|
2016 |
Almaian RY, Needy KL, Alves TDCL, Walsh KD. Analyzing Effective Supplier-Quality-Management Practices Using Simple Multiattribute Rating Technique and Value-Focused Thinking Journal of Management in Engineering. 32. DOI: 10.1061/(Asce)Me.1943-5479.0000364 |
0.767 |
|
2016 |
AlMaian RY, Needy KL, Walsh KD, Alves TDCL. A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001046 |
0.769 |
|
2016 |
Scala NM, Rajgopal J, Vargas LG, Needy KL. Group Decision Making with Dispersion in the Analytic Hierarchy Process Group Decision and Negotiation. 25: 355-372. DOI: 10.1007/S10726-015-9445-7 |
0.31 |
|
2015 |
Claypool EG, Norman BA, Needy KL. Design for Supply Chain: An Analysis of Key Risk Factors Industrial Engineering and Management. 2015: 1-8. DOI: 10.4172/2169-0316.1000156 |
0.32 |
|
2015 |
Neuman Y, Alves TDCL, Walsh KD, Needy KL. Quantitative Analysis of Supplier Quality Surveillance Practices in EPC Projects Journal of Construction Engineering and Management. 141. DOI: 10.1061/(Asce)Co.1943-7862.0001023 |
0.631 |
|
2014 |
Scala NM, Rajgopal J, Needy KL. Managing nuclear spare parts inventories: A data driven methodology Ieee Transactions On Engineering Management. 61: 28-37. DOI: 10.1109/Tem.2013.2283170 |
0.438 |
|
2014 |
Ahmad S, Walsh KD, Alves TDCL, Needy KL. An analysis of process v. inspection capabilities in fabricated, engineered-to-order construction supply chains Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress. 2325-2334. DOI: 10.1061/9780784413517.0236 |
0.417 |
|
2014 |
Neuman Y, Alves TDCL, Walsh KD, Needy KL, Almaian RY. Analysis of supplier quality surveillance in epc projects 22nd Annual Conference of the International Group For Lean Construction: Understanding and Improving Project Based Production, Iglc 2014. 1083-1094. |
0.76 |
|
2013 |
Scala NM, Rajgopal J, Needy KL. A base stock inventory management system for intermittent spare parts Military Operations Research. 18: 63-77. DOI: 10.5711/1082598318363 |
0.396 |
|
2013 |
AlMaian RY, Needy KL, Walsh KD, Da Alves TCL, Neuman Y. Supplier Quality Management inside and outside the construction industry International Annual Conference of the American Society For Engineering Management 2013, Asem 2013. 90-100. DOI: 10.1080/10429247.2015.11432032 |
0.756 |
|
2013 |
Da Alves TCL, Walsh KD, Neuman Y, Needy KL, Almaian R. Supplier quality surveillance practices in construction 21st Annual Conference of the International Group For Lean Construction 2013, Iglc 2013. 716-725. |
0.545 |
|
2010 |
Bilec MM, Geary M, Ries RJ, Needy KL, Cashion MK. A method for quantifying the benefits of greening a healthcare facility Emj - Engineering Management Journal. 22: 3-11. DOI: 10.1080/10429247.2010.11431867 |
0.459 |
|
2010 |
Scala NM, Rajgopal J, Needy KL. Influence diagram modeling of nuclear spare parts process Iie Annual Conference and Expo 2010 Proceedings. |
0.301 |
|
2009 |
Bilec MM, Ries RJ, Needy KL, Gokhan M, Phelps AF, Enache-Pommer E, Horman MJ, Little SE, Powers TL, McGregor E, Sheane C. Analysis of the design process of green children's hospitals: Focus on process modeling and lessons learned Journal of Green Building. 4: 121-134. DOI: 10.3992/Jgb.4.1.121 |
0.303 |
|
2008 |
Turan FK, Scala NM, Kamrani A, Needy KL. Organizational sustainability: A new project portfolio management approach that integrates financial and non-financial performance measures Iie Annual Conference and Expo 2008. 1025-1030. |
0.31 |
|
2006 |
Abdulmalek FA, Rajgopal J, Needy KL. A classification scheme for the process industry to guide the implementation of lean Emj - Engineering Management Journal. 18: 15-25. DOI: 10.1080/10429247.2006.11431690 |
0.393 |
|
2006 |
Ries R, Bilec MM, Gokhan NM, Needy KL. The economic benefits of green buildings: A comprehensive case study Engineering Economist. 51: 259-295. DOI: 10.1080/00137910600865469 |
0.403 |
|
2006 |
Adeyemi Y, Needy KL. An analysis of Six Sigma at small vs. large manufacturing companies 2006 Iie Annual Conference and Exhibition. |
0.344 |
|
2006 |
Rabeneck DR, Snyder P, Nickoloff D, Kassimer D, Needy KL. A case study of the logistical preparations for a reality tv show 27th Annual National Conference of the American Society For Engineering Management 2006 - Managing Change: Managing People and Technology in a Rapidly Changing World, Asem 2006. 387-392. |
0.374 |
|
2005 |
Bidanda B, Ariyawongrat P, Needy KL, Norman BA, Tharmmaphornphilas W. Human related issues in manufacturing cell design, implementation, and operation: A review and survey Computers and Industrial Engineering. 48: 507-523. DOI: 10.1016/J.Cie.2003.03.002 |
0.375 |
|
2005 |
Gross EA, Needy KL, Norman BA. Inventory management in a build-to-order environment Iie Annual Conference and Exposition 2005. |
0.318 |
|
2004 |
Roztocki N, Porter JD, Thomas RM, Needy KL. A Procedure for Smooth Implementation of Activity-Based Costing in Small Companies Engineering Management Journal. 16: 19-27. DOI: 10.1080/10429247.2004.11415262 |
0.327 |
|
2003 |
Wilson JP, Walsh MAT, Needy KL. An Examination of the Economic Benefits of ISO 9000 and the Baldrige Award to Manufacturing Firms Engineering Management Journal. 15: 3-10. DOI: 10.1080/10429247.2003.11415220 |
0.455 |
|
2003 |
Needy KL, Nachtmann H, Roztocki N, Colosimo Warner R, Bidanda B. Implementing activity-based costing systems in small manufacturing firms: A field study Emj - Engineering Management Journal. 15: 3-10. DOI: 10.1080/10429247.2003.11415190 |
0.406 |
|
2002 |
Needy KL, Norman BA, Bidanda B, Ariyawongrat P, Warner RC. Assessing human capital: A lean manufacturing example Emj - Engineering Management Journal. 14: 35-39. DOI: 10.1080/10429247.2002.11415171 |
0.373 |
|
2002 |
Norman BA, Tharmmaphornphilas W, Needy KL, Bidanda B, Warner RC. Worker assignment in cellular manufacturing considering technical and human skills International Journal of Production Research. 40: 1479-1492. DOI: 10.1080/00207540110118082 |
0.339 |
|
2002 |
Needy KL, Bidanda B. Successfully partnering with industry through the industrial engineering senior design project Asee Annual Conference Proceedings. 7873-7880. |
0.381 |
|
2001 |
Nachtmann H, Needy KL. Fuzzy Activity Based Costing: A Methodology For Handling Uncertainty In Activity Based Costing Systems The Engineering Economist. 46: 245-273. DOI: 10.1080/00137910108967577 |
0.32 |
|
2000 |
Needy KL, Bidanda B, Gulsen M. A model to develop, assess, and validate an activity-based costing system for small manufacturers Emj - Engineering Management Journal. 12: 31-38. DOI: 10.1080/10429247.2000.11415061 |
0.363 |
|
2000 |
Needy KL, Nachtmann H, Lavelle JP, Eschenbach TG. An empirical analysis of engineering economy pedagogy Engineering Economist. 45: 74-92. DOI: 10.1080/00137910008967537 |
0.326 |
|
1999 |
Roztocki N, Needy KL. Integrating activity-based costing and economic value added in manufacturing Emj - Engineering Management Journal. 11: 17-22. DOI: 10.1080/10429247.1999.11415023 |
0.364 |
|
1999 |
Needy KL, Cleland DI, Slevin DP, Nachtmann H, Cohen SL. Critical factors in successful corporate governance Asee Annual Conference Proceedings. 1419-1425. |
0.365 |
|
1998 |
Billo RE, Needy KL, Barbe TA. The application of automatic identification and checkweigh for automated inspection in cellular assembly Quality Engineering. 10: 427-435. DOI: 10.1080/08982119808919156 |
0.407 |
|
1998 |
Needy KL, Billo RE, Warner RC. A cost model for the evaluation of alternative cellular manufacturing configurations Computers and Industrial Engineering. 34: 119-134. DOI: 10.1016/S0360-8352(97)00155-1 |
0.321 |
|
1996 |
Billo RE, Needy KL, Bidanda B. Challenges facing information technology to support world class manufacturing Computers in Industry. 28: 163-165. DOI: 10.1016/0166-3615(95)00041-0 |
0.444 |
|
Show low-probability matches. |