Year |
Citation |
Score |
2017 |
Mahasneh JK, Thabet WY. Utilising design for Six Sigma to implement soft skills in construction education International Journal of Six Sigma and Competitive Advantage. 10: 157. DOI: 10.1504/Ijssca.2017.10007637 |
0.423 |
|
2017 |
Thabet W, Lucas J. Asset Data Handover for a Large Educational Institution: Case-Study Approach Journal of Construction Engineering and Management-Asce. 143: 5017017. DOI: 10.1061/(Asce)Co.1943-7862.0001389 |
0.614 |
|
2016 |
Wetzel EM, Thabet WY. Utilizing Six Sigma to develop standard attributes for a Safety for Facilities Management (SFFM) framework Safety Science. 89: 355-368. DOI: 10.1016/J.Ssci.2016.07.010 |
0.429 |
|
2015 |
Wetzel EM, Thabet WY. The use of a BIM-based framework to support safe facility management processes Automation in Construction. 60: 12-24. DOI: 10.1016/J.Autcon.2015.09.004 |
0.485 |
|
2013 |
Lucas J, Bulbul T, Thabet W, Anumba C. Case Analysis to Identify Information Links between Facility Management and Healthcare Delivery Information in a Hospital Setting Journal of Architectural Engineering. 19: 134-145. DOI: 10.1061/(Asce)Ae.1943-5568.0000111 |
0.661 |
|
2013 |
Lucas J, Bulbul T, Thabet W. An object-oriented model to support healthcare facility information management Automation in Construction. 31: 281-291. DOI: 10.1016/J.Autcon.2012.12.014 |
0.662 |
|
2011 |
McCoy A, Thabet W, Badinelli R. Defining a commercialisation model for residential construction innovation: industry case studies Construction Innovation: Information, Process, Management. 11: 114-133. DOI: 10.1108/14714171111104664 |
0.453 |
|
2010 |
McCoy AP, Badinelli R, Koebel CT, Thabet W. Concurrent commercialization and new‐product adoption for construction products European Journal of Innovation Management. 13: 222-243. DOI: 10.1108/14601061011040267 |
0.392 |
|
2009 |
McCoy AP, Thabet W, Badinelli R. Understanding the role of developer/builders in the concurrent commercialization of product innovation European Journal of Innovation Management. 12: 102-128. DOI: 10.1108/14601060910928193 |
0.465 |
|
2008 |
McCoy AP, Thabet W, Badinelli R. Towards establishing a domain specific commercialization model for innovation in residential construction Construction Innovation: Information, Process, Management. 8: 137-155. DOI: 10.1108/14714170810867050 |
0.428 |
|
2003 |
Nassar K, Thabet W, Beliveau Y. A procedure for multi-criteria selection of building assemblies Automation in Construction. 12: 543-560. DOI: 10.1016/S0926-5805(03)00007-4 |
0.364 |
|
2003 |
Nassar K, Thabet W, Beliveau Y. Simulation of asphalt paving operations under lane closure conditions Automation in Construction. 12: 527-541. DOI: 10.1016/S0926-5805(03)00005-0 |
0.366 |
|
2003 |
Nassar K, Thabet W, Beliveau Y. Building assembly detailing using constraint-based modeling Automation in Construction. 12: 365-379. DOI: 10.1016/S0926-5805(02)00090-0 |
0.379 |
|
2003 |
Waly AF, Thabet WY. A Virtual Construction Environment for preconstruction planning Automation in Construction. 12: 139-154. DOI: 10.1016/S0926-5805(02)00047-X |
0.479 |
|
2002 |
Perdomo JL, Thabet W. Material Management Practices for the Electrical Contractor Computing in Civil Engineering. 232-243. DOI: 10.1061/40652(2003)20 |
0.383 |
|
1997 |
Thabet WY, Beliveau YJ. SCaRC: Space-Constrained Resource-Constrained scheduling system Journal of Computing in Civil Engineering. 11: 48-59. DOI: 10.1061/(Asce)0887-3801(1997)11:1(48) |
0.369 |
|
1994 |
Thabet WY, Beliveau YJ. HVLS: Horizontal and vertical logic scheduling for multistory projects Journal of Construction Engineering and Management. 120: 875-892. DOI: 10.1061/(Asce)0733-9364(1994)120:4(875) |
0.392 |
|
1994 |
Thabet WY, Beliveau YJ. Modeling work space to schedule repetitive floors in multistory buildings Journal of Construction Engineering and Management. 120: 96-116. DOI: 10.1061/(Asce)0733-9364(1994)120:1(96) |
0.401 |
|
Show low-probability matches. |