I-Tung Yang, Ph.D. - Publications

Affiliations: 
2002 University of Michigan, Ann Arbor, Ann Arbor, MI 
Area:
Civil Engineering, Industrial Engineering

26 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2019 Chou J, Cheng M, Hsieh Y, Yang I, Hsu H. Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance Automation in Construction. 99: 1-17. DOI: 10.1016/J.Autcon.2018.11.020  0.342
2017 Cheng M, Chiu K, Hsieh Y, Yang I, Chou J, Wu Y. BIM integrated smart monitoring technique for building fire prevention and disaster relief Automation in Construction. 84: 14-30. DOI: 10.1016/J.Autcon.2017.08.027  0.317
2016 Lin YC, Lee HY, Yang IT. Developing as-built BIM model process management system for general contractors: A case study Journal of Civil Engineering and Management. 22: 608-621. DOI: 10.3846/13923730.2014.914081  0.358
2016 Ioannou PG, Yang IT. Repetitive Scheduling Method: Requirements, Modeling, and Implementation Journal of Construction Engineering and Management. 142. DOI: 10.1061/(Asce)Co.1943-7862.0001107  0.639
2016 Yang IT, Hsieh YH, Kuo CG. Integrated multiobjective framework for reliability-based design optimization with discrete design variables Automation in Construction. 63: 162-172. DOI: 10.1016/J.Autcon.2015.12.010  0.356
2014 Yang I, Lin Y, Lee H. Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off Journal of Construction Engineering and Management-Asce. 140: 4013036-4013036. DOI: 10.1061/(Asce)Co.1943-7862.0000784  0.42
2013 Wang W, Yu W, Yang I, Lin C, Lee M, Cheng Y. Applying the AHP to support the best-value contractor selection-lessons learned from two case studies in Taiwan Journal of Civil Engineering and Management. 19: 24-36. DOI: 10.3846/13923730.2012.734851  0.351
2013 Yang I, Hsieh Y. Reliability-based design optimization with cooperation between support vector machine and particle swarm optimization Engineering With Computers. 29: 151-163. DOI: 10.1007/S00366-011-0251-9  0.342
2012 Yang IT, Hsieh YM, Kung LO. Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning Journal of Construction Engineering and Management. 138: 215-226. DOI: 10.1061/(Asce)Co.1943-7862.0000421  0.437
2012 Lee H, Yang I, Lin Y. Laying out the occupant flows in public buildings for operating efficiency Building and Environment. 51: 231-242. DOI: 10.1016/J.Buildenv.2011.11.005  0.308
2012 Yang IT, Wang WC, Yang TI. Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process Automation in Construction. 22: 290-297. DOI: 10.1016/J.Autcon.2011.09.004  0.337
2011 Yang IT. Stochastic time-cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance Automation in Construction. 20: 916-926. DOI: 10.1016/J.Autcon.2011.03.008  0.438
2011 Yang I, Hsieh Y. Reliability-based design optimization with discrete design variables and non-smooth performance functions: AB-PSO algorithm Automation in Construction. 20: 610-619. DOI: 10.1016/J.Autcon.2010.12.003  0.395
2011 Yang I, Chou J. Multiobjective optimization for manpower assignment in consulting engineering firms Applied Soft Computing. 11: 1183-1190. DOI: 10.1016/J.Asoc.2010.02.016  0.419
2009 Hsie M, Chang C, Yang I, Huang C. Resource-constrained scheduling for continuous repetitive projects with time-based production units Automation in Construction. 18: 942-949. DOI: 10.1016/J.Autcon.2009.04.006  0.458
2009 Chou JS, Yang IT, Chong WK. Probabilistic simulation for developing likelihood distribution of engineering project cost Automation in Construction. 18: 570-577. DOI: 10.1016/J.Autcon.2008.12.001  0.423
2008 Yang IT. Distribution-free Monte Carlo simulation: Premise and refinement Journal of Construction Engineering and Management. 134: 352-360. DOI: 10.1061/(Asce)0733-9364(2008)134:5(352)  0.348
2007 Yang IT. Risk modeling of dependence among project task durations Computer-Aided Civil and Infrastructure Engineering. 22: 419-429. DOI: 10.1111/J.1467-8667.2007.00497.X  0.423
2007 Yang IT. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis Journal of Construction Engineering and Management. 133: 498-505. DOI: 10.1061/(Asce)0733-9364(2007)133:7(498)  0.427
2007 Yang IT. Performing complex project crashing analysis with aid of particle swarm optimization algorithm International Journal of Project Management. 25: 637-646. DOI: 10.1016/J.Ijproman.2006.11.001  0.504
2006 Yang IT. Using Gaussian copula to simulate repetitive projects Construction Management and Economics. 24: 901-909. DOI: 10.1080/01446190600658784  0.384
2005 Yang IT. Impact of budget uncertainty on project time-cost tradeoff Ieee Transactions On Engineering Management. 52: 167-174. DOI: 10.1109/Tem.2005.844924  0.443
2005 Yang IT. Chance-constrained time-cost tradeoff analysis considering funding variability Journal of Construction Engineering and Management. 131: 1002-1012. DOI: 10.1061/(Asce)0733-9364(2005)131:9(1002)  0.405
2005 Yang I, Chang C. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding International Journal of Project Management. 23: 546-553. DOI: 10.1016/J.Ijproman.2005.03.003  0.461
2004 Yang IT, Ioannou PG. Scheduling system with focus on practical concerns in repetitive projects Construction Management and Economics. 22: 619-630. DOI: 10.1080/01446190310001649065  0.649
2003 Ioannou PG, Harris RB, Yang IT, Ammar MA, Elbeltagi E. Discussion of "algorithm for determining controlling path considering resource continuity" by Mohammed A. Ammar and Emad Elbeltagi Journal of Computing in Civil Engineering. 17: 68-73. DOI: 10.1061/(Asce)0887-3801(2003)17:1(68)  0.582
Show low-probability matches.