Huang Y, Shi Q, Pena-Mora F, Lu Y, Shen C. Exploring the Impact of Information and Communication Technology on Team Social Capital and Construction Project Performance Journal of Management in Engineering. 36: 4020056. DOI: 10.1061/(Asce)Me.1943-5479.0000804 |
0.378 |
|
2020 |
Fang W, Ding L, Love PED, Luo H, Li H, Peña-Mora F, Zhong B, Zhou C. Computer vision applications in construction safety assurance Automation in Construction. 110: 103013. DOI: 10.1016/J.Autcon.2019.103013 |
0.359 |
|
2019 |
Lu Z, Peña-Mora F, Wang SQ, Liu T, Wu D. Assessment Framework for Financing Public–Private Partnership Infrastructure Projects through Asset-Backed Securitization Journal of Management in Engineering. 35: 4019027. DOI: 10.1061/(Asce)Me.1943-5479.0000708 |
0.363 |
|
2019 |
Mao Q, Li N, Peña-Mora F. Quality function deployment-based framework for improving the resilience of critical infrastructure systems International Journal of Critical Infrastructure Protection. 26: 100304. DOI: 10.1016/J.Ijcip.2019.100304 |
0.354 |
|
2019 |
Song X, Peña-Mora F, Shen C, Zhang Z, Xu J. Modelling the effect of multi-stakeholder interactions on construction site layout planning using agent-based decentralized optimization Automation in Construction. 107: 102927. DOI: 10.1016/J.Autcon.2019.102927 |
0.404 |
|
2018 |
Shen C, Pena-Mora F. Blockchain for Cities—A Systematic Literature Review Ieee Access. 6: 76787-76819. DOI: 10.1109/Access.2018.2880744 |
0.356 |
|
2018 |
Song X, Zhong L, Zhang Z, Xu J, Shen C, Peña-Mora F. Multistakeholder Conflict Minimization–Based Layout Planning of Construction Temporary Facilities Journal of Computing in Civil Engineering. 32: 04017080. DOI: 10.1061/(Asce)Cp.1943-5487.0000725 |
0.363 |
|
2018 |
Song X, Xu J, Shen C, Peña-Mora F. Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective Automation in Construction. 87: 138-157. DOI: 10.1016/J.Autcon.2017.12.018 |
0.429 |
|
2018 |
Song X, Zhang Z, Xu J, Zeng Z, Shen C, Peña-Mora F. Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects International Journal of Civil Engineering. 16: 941-964. DOI: 10.1007/S40999-017-0233-4 |
0.454 |
|
2017 |
Riaz Z, Parn EA, Edwards DJ, Arslan M, Shen C, Pena-Mora F. BIM and sensor-based data management system for construction safety monitoring Journal of Engineering, Design and Technology. 15: 738-753. DOI: 10.1108/Jedt-03-2017-0017 |
0.379 |
|
2017 |
Song X, Xu J, Zhang Z, Shen C, Xie H, Peña-Mora F, Wu Y. Reconciling strategy towards construction site selection-layout for coal-fired power plants Applied Energy. 204: 846-865. DOI: 10.1016/J.Apenergy.2017.07.091 |
0.366 |
|
2017 |
Song X, Xu J, Shen C, Peña-Mora F, Zeng Z. A Decision Making System for Construction Temporary Facilities Layout Planning in Large-scale Construction Projects International Journal of Civil Engineering. 15: 333-353. DOI: 10.1007/S40999-016-0107-1 |
0.41 |
|
2016 |
Song X, Xu J, Shen C, Peña-Mora F. Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects Canadian Journal of Civil Engineering. 43: 783-801. DOI: 10.1139/Cjce-2015-0144 |
0.474 |
|
2015 |
Ahn CR, Lee S, Peña-Mora F. Application of low-cost accelerometers for measuring the operational efficiency of a construction equipment fleet Journal of Computing in Civil Engineering. 29: 4014042. DOI: 10.1061/(Asce)Cp.1943-5487.0000337 |
0.318 |
|
2015 |
Golparvar-Fard M, Peña-Mora F, Savarese S. Automated progress monitoring using unordered daily construction photographs and IFC-based building information models Journal of Computing in Civil Engineering. 29. DOI: 10.1061/(Asce)Cp.1943-5487.0000205 |
0.464 |
|
2015 |
Lu Z, Peña-Mora F, Wang XR, Shen CQ, Riaz Z. Social Impact Project Finance: An Innovative and Sustainable Infrastructure Financing Framework☆ Procedia Engineering. 123: 300-307. DOI: 10.1016/J.Proeng.2015.10.094 |
0.408 |
|
2014 |
Han S, Saba F, Lee S, Mohamed Y, Peña-Mora F. Toward an understanding of the impact of production pressure on safety performance in construction operations. Accident; Analysis and Prevention. 68: 106-16. PMID 24184131 DOI: 10.1016/J.Aap.2013.10.007 |
0.339 |
|
2014 |
Song X, Peña-Mora F, Menassa CC, Arboleda CA. Determining the optimal premium for ADR implementation insurance in construction dispute resolution Journal of Management in Engineering. 30. DOI: 10.1061/(Asce)Me.1943-5479.0000188 |
0.426 |
|
2013 |
Ahn CR, Lee S, Peña-Mora F. Acceleromter-Based Measurement of Construction Equipment Operating Efficiency for Monitoring Environmental Performance Computing in Civil Engineering. 565-572. DOI: 10.1061/9780784413029.071 |
0.347 |
|
2013 |
Ahn C, Peña-Mora F, Lee S, Arboleda CA. Consideration of the environmental cost in construction contracting for public works: A + C and A + B + C bidding methods Journal of Management in Engineering. 29: 86-94. DOI: 10.1061/(Asce)Me.1943-5479.0000124 |
0.374 |
|
2013 |
Han S, Love PED, Peña-Mora F. A system dynamics model for assessing the impacts of design errors in construction projects Mathematical and Computer Modelling. 57: 2044-2053. DOI: 10.1016/J.Mcm.2011.06.039 |
0.41 |
|
2012 |
Peña-Mora F, Thomas JK, Golparvar-Fard M, Aziz Z. Supporting Civil Engineers during Disaster Response and Recovery Using a Segway Mobile Workstation Chariot Journal of Computing in Civil Engineering. 26: 448-455. DOI: 10.1061/(Asce)Cp.1943-5487.0000117 |
0.365 |
|
2012 |
Han S, Lee S, Peña-Mora F. Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects Journal of Construction Engineering and Management-Asce. 138: 98-109. DOI: 10.1061/(Asce)Co.1943-7862.0000406 |
0.462 |
|
2012 |
Song X, Peña-Mora F, Menassa CC, Arboleda CA. Insurance as a risk management tool for ADR implementation in construction disputes Journal of Construction Engineering and Management. 138: 14-21. DOI: 10.1061/(Asce)Co.1943-7862.0000401 |
0.427 |
|
2012 |
Mathur S, Poole MS, Peña-Mora F, Hasegawa-Johnson M, Contractor N. Detecting interaction links in a collaborating group using manually annotated data Social Networks. 34: 515-526. DOI: 10.1016/J.Socnet.2012.04.002 |
0.32 |
|
2012 |
Chen AY, PeñA-Mora F, Plans AP, Mehta SJ, Aziz Z. Supporting Urban Search and Rescue with digital assessments of structures and requests of response resources Advanced Engineering Informatics. 26: 833-845. DOI: 10.1016/J.Aei.2012.06.004 |
0.374 |
|
2011 |
Chen AY, Han S, Lee S, Pena-Mora F. A Civilian Reporting Service to Guide Converging Resources for Search and Rescue in Disaster Response Journal of Construction Engineering and Project Management. 1: 45-51. DOI: 10.6106/Jcepm.2011.1.3.045 |
0.352 |
|
2011 |
Chen AY, Peña-Mora F. Coordination of converging construction equipment in disaster response Congress On Computing in Civil Engineering, Proceedings. 299-306. DOI: 10.1061/41182(416)37 |
0.391 |
|
2011 |
Golparvar-Fard M, Peña-Mora F, Savarese S. Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry Journal of Construction Engineering and Management. 137: 1099-1116. DOI: 10.1061/(Asce)Co.1943-7862.0000371 |
0.432 |
|
2011 |
Golparvar-Fard M, Bohn J, Teizer J, Savarese S, Peña-Mora F. Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques Automation in Construction. 20: 1143-1155. DOI: 10.1016/J.Autcon.2011.04.016 |
0.394 |
|
2011 |
Chen AY, Peña-Mora F, Ouyang Y. A collaborative GIS framework to support equipment distribution for civil engineering disaster response operations Automation in Construction. 20: 637-648. DOI: 10.1016/J.Autcon.2010.12.007 |
0.404 |
|
2011 |
Roh S, Aziz Z, Peña-Mora F. An object-based 3D walk-through model for interior construction progress monitoring Automation in Construction. 20: 66-75. DOI: 10.1016/J.Autcon.2010.07.003 |
0.37 |
|
2009 |
Chen AY, Peña-Mora F. Collaborative gis for request of construction equipment in disaster response Proceedings of the 2009 Asce International Workshop On Computing in Civil Engineering. 346: 146-155. DOI: 10.1061/41052(346)15 |
0.36 |
|
2008 |
Ricaurte JL, Arboleda CA, Peña-Mora F. Civil engineers in public-private partnerships and as master planners for infrastructure development Leadership and Management in Engineering. 8: 276-286. DOI: 10.1061/(Asce)1532-6748(2008)8:4(276) |
0.423 |
|
2008 |
Peña-Mora F, Han S, Lee S, Park M. Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach Journal of Construction Engineering and Management-Asce. 134: 701-710. DOI: 10.1061/(Asce)0733-9364(2008)134:9(701) |
0.438 |
|
2007 |
Fard MG, Peña-Mora F. Application of Visualization Techniques for Construction Progress Monitoring Computing in Civil Engineering. 216-223. DOI: 10.1061/40937(261)27 |
0.381 |
|
2007 |
Ng HS, Peña-Mora F, Tamaki T. Dynamic Conflict Management in Large-Scale Design and Construction Projects Journal of Management in Engineering. 23: 52-66. DOI: 10.1061/(Asce)0742-597X(2007)23:2(52) |
0.453 |
|
2007 |
Motawa IA, Anumba CJ, Lee S, Peña-Mora F. An integrated system for change management in construction Automation in Construction. 16: 368-377. DOI: 10.1016/J.Autcon.2006.07.005 |
0.429 |
|
2007 |
Lee SH, Peña-Mora F. Understanding and managing iterative error and change cycles in construction System Dynamics Review. 23: 35-60. DOI: 10.1002/Sdr.359 |
0.465 |
|
2006 |
Lee S, Peña-Mora F, Park M. Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction Projects Journal of Computing in Civil Engineering. 20: 290-300. DOI: 10.1061/(Asce)0887-3801(2006)20:4(290) |
0.508 |
|
2006 |
Soibelman L, Peña-Mora F. Computing in civil engineering-Lessons Learned from the 2005 ASCE International Conference on Computing in Civil Engineering Journal of Computing in Civil Engineering. 20: 223-224. DOI: 10.1061/(Asce)0887-3801(2006)20:4(223) |
0.346 |
|
2006 |
Aldunate R, Ochoa SF, Peña-Mora F, Nussbaum M. Robust Mobile Ad Hoc Space for Collaboration to Support Disaster Relief Efforts Involving Critical Physical Infrastructure Journal of Computing in Civil Engineering. 20: 13-27. DOI: 10.1061/(Asce)0887-3801(2006)20:1(13) |
0.411 |
|
2006 |
Lee S, Peña-Mora F, Park M. Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects Journal of Construction Engineering and Management-Asce. 132: 452-464. DOI: 10.1061/(Asce)0733-9364(2006)132:5(452) |
0.437 |
|
2006 |
Lee SH, Peña-Mora F, Park M. Dynamic planning and control methodology for strategic and operational construction project management Automation in Construction. 15: 84-97. DOI: 10.1016/J.Autcon.2005.02.008 |
0.469 |
|
2005 |
Lee SH, Peña-Mora F, Park M. Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects Journal of Construction Engineering and Management-Asce. 131: 890-902. DOI: 10.1061/(Asce)0733-9364(2005)131:8(890) |
0.484 |
|
2005 |
Aldunate RG, Pena-Mora F, Robinson GE. Collaborative distributed decision making for large scale disaster relief operations: Drawing analogies from robust natural systems Complexity. 11: 28-38. DOI: 10.1002/Cplx.V11:2 |
0.334 |
|
2004 |
Park M, Peña-Mora F. Reliability Buffering for Construction Projects Journal of Construction Engineering and Management-Asce. 130: 626-637. DOI: 10.1061/(Asce)0733-9364(2004)130:5(626) |
0.476 |
|
2003 |
Park M, Peña-Mora F. Dynamic change management for construction: introducing the change cycle into model‐based project management System Dynamics Review. 19: 213-242. DOI: 10.1002/Sdr.273 |
0.481 |
|
2002 |
Peña-Mora F, Dwivedi GH. Multiple device collaborative and real time analysis system for project management in civil engineering Journal of Computing in Civil Engineering. 16: 23-38. DOI: 10.1061/(Asce)0887-3801(2002)16:1(23) |
0.474 |
|
2002 |
Peña-Mora F, Tanaka S. Information Technology Planning Framework for Japanese General Contractors Journal of Management in Engineering. 18: 138-149. DOI: 10.1061/(Asce)0742-597X(2002)18:3(138) |
0.49 |
|
2001 |
Favela J, Peña-Mora F. An experience in collaborative software engineering education Ieee Software. 18: 47-53. DOI: 10.1109/52.914742 |
0.348 |
|
2001 |
Peña-Mora F, Choudary KK. Web-centric framework for secure and legally binding electronic transactions in large-scale A/E/C projects Journal of Computing in Civil Engineering. 15: 248-258. DOI: 10.1061/(Asce)0887-3801(2001)15:4(248) |
0.429 |
|
2001 |
Peña-Mora F, Tamaki T. Effect of Delivery Systems on Collaborative Negotiations for Large-Scale Infrastructure Projects Journal of Management in Engineering. 17: 105-121. DOI: 10.1061/(Asce)0742-597X(2001)17:2(105) |
0.459 |
|
2001 |
Peña-Mora F, Harpoth N. Effective Partnering In Innovative Procured Multicultural Project Journal of Management in Engineering. 17: 2-13. DOI: 10.1061/(Asce)0742-597X(2001)17:1(2) |
0.455 |
|
2001 |
Pena-Mora F, Park M. Dynamic Planning for Fast-Tracking Building Construction Projects Journal of Construction Engineering and Management. 127: 445-456. DOI: 10.1061/(Asce)0733-9364(2001)127:6(445) |
0.403 |
|
2001 |
Peña-Mora F, Li M. Dynamic Planning And Control Methodology For Design/Build Fast-Track Construction Projects Journal of Construction Engineering and Management-Asce. 127: 1-17. DOI: 10.1061/(Asce)0733-9364(2001)127:1(1) |
0.477 |
|
2001 |
Peña-mora F, Vadhavkar S, Dirisala SK. Component-based software development for integrated construction management software applications Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 15: 173-187. DOI: 10.1017/S0890060401152054 |
0.387 |
|
2000 |
Vadhavkar S, Peña-Mora F. Geographically Distributed Team Interaction Space Computing in Civil and Building Engineering. 373-379. DOI: 10.1061/40513(279)48 |
0.34 |
|
2000 |
Soibelman L, Peña-Mora F. Distributed Multi-Reasoning Mechanism To Support Conceptual Structural Design Journal of Structural Engineering-Asce. 126: 733-742. DOI: 10.1061/(Asce)0733-9445(2000)126:6(733) |
0.35 |
|
2000 |
Peña-Mora F, Hussein K, Vadhavkar S, Benjamin K. CAIRO: a concurrent engineering meeting environment for virtual design teams Artificial Intelligence in Engineering. 14: 203-219. DOI: 10.1016/S0954-1810(00)00016-9 |
0.413 |
|
2000 |
Peña-Mora F, Anumba CJ, Solari J, Duke A. An Integrated Telepresence Environment for Collaboration in Construction Engineering With Computers. 16: 287-305. DOI: 10.1007/Pl00013717 |
0.471 |
|
1999 |
Peña-Mora F, Vadhavkar S, Perkins E, Weber T. Information Technology Planning Framework For Large-Scale Projects Journal of Computing in Civil Engineering. 13: 226-237. DOI: 10.1061/(Asce)0887-3801(1999)13:4(226) |
0.457 |
|
1998 |
Peña-Mora F, Wang C. Computer-Supported Collaborative Negotiation Methodology Journal of Computing in Civil Engineering. 12: 64-81. DOI: 10.1061/(Asce)0887-3801(1998)12:2(64) |
0.437 |
|
1998 |
Peña-Mora F, Hussein K. Proactive meeting management for distributed collaborative design Advances in Engineering Software. 29: 839-849. DOI: 10.1016/S0965-9978(97)00068-9 |
0.396 |
|
1997 |
Filman R, Pena-Mora F. The collaborating spider Ieee Internet Computing. 1: 56-57. DOI: 10.1109/Mic.1997.589195 |
0.336 |
|
1997 |
Filman R, Peña-Mora F. The Engineering Web Ieee Internet Computing. 1: 72-74. DOI: 10.1109/Mic.1997.10006 |
0.311 |
|
1997 |
Peña-Mora F, Vadhavkar S. Augmenting design patterns with design rationale Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 11: 93-108. DOI: 10.1017/S089006040000189X |
0.378 |
|
1996 |
Peña-Mora F, Hussein K, Sriram RD. CAIRO: a system for facilitating communication in a distributed collaborative engineering environment Computers in Industry. 29: 37-50. DOI: 10.1016/0166-3615(95)00053-4 |
0.361 |
|
1995 |
Peña-Mora F, Sriram D, Logcher R. Design rationale for computer-supported conflict mitigation Journal of Computing in Civil Engineering. 9: 57-72. DOI: 10.1061/(Asce)0887-3801(1995)9:1(57) |
0.419 |
|
1995 |
Peña-Mora F, Sriram RD, Logcher R. Conflict mitigation system for collaborative engineering Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 9: 101-124. DOI: 10.1017/S0890060400002158 |
0.399 |
|