70 high-probability publications. We are testing a new system for linking publications to authors. You can help! If you notice any inaccuracies, please sign in and mark papers as correct or incorrect matches. If you identify any major omissions or other inaccuracies in the publication list, please let us know.

Year Citation  Score
2020 Huang Y, Shi Q, Pena-Mora F, Lu Y, Shen C. Exploring the Impact of Information and Communication Technology on Team Social Capital and Construction Project Performance Journal of Management in Engineering. 36: 4020056. DOI: 10.1061/(Asce)Me.1943-5479.0000804  0.378
2020 Fang W, Ding L, Love PED, Luo H, Li H, Peña-Mora F, Zhong B, Zhou C. Computer vision applications in construction safety assurance Automation in Construction. 110: 103013. DOI: 10.1016/J.Autcon.2019.103013  0.359
2019 Lu Z, Peña-Mora F, Wang SQ, Liu T, Wu D. Assessment Framework for Financing Public–Private Partnership Infrastructure Projects through Asset-Backed Securitization Journal of Management in Engineering. 35: 4019027. DOI: 10.1061/(Asce)Me.1943-5479.0000708  0.363
2019 Mao Q, Li N, Peña-Mora F. Quality function deployment-based framework for improving the resilience of critical infrastructure systems International Journal of Critical Infrastructure Protection. 26: 100304. DOI: 10.1016/J.Ijcip.2019.100304  0.354
2019 Song X, Peña-Mora F, Shen C, Zhang Z, Xu J. Modelling the effect of multi-stakeholder interactions on construction site layout planning using agent-based decentralized optimization Automation in Construction. 107: 102927. DOI: 10.1016/J.Autcon.2019.102927  0.404
2018 Shen C, Pena-Mora F. Blockchain for Cities—A Systematic Literature Review Ieee Access. 6: 76787-76819. DOI: 10.1109/Access.2018.2880744  0.356
2018 Song X, Zhong L, Zhang Z, Xu J, Shen C, Peña-Mora F. Multistakeholder Conflict Minimization–Based Layout Planning of Construction Temporary Facilities Journal of Computing in Civil Engineering. 32: 04017080. DOI: 10.1061/(Asce)Cp.1943-5487.0000725  0.363
2018 Song X, Xu J, Shen C, Peña-Mora F. Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective Automation in Construction. 87: 138-157. DOI: 10.1016/J.Autcon.2017.12.018  0.429
2018 Song X, Zhang Z, Xu J, Zeng Z, Shen C, Peña-Mora F. Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects International Journal of Civil Engineering. 16: 941-964. DOI: 10.1007/S40999-017-0233-4  0.454
2017 Riaz Z, Parn EA, Edwards DJ, Arslan M, Shen C, Pena-Mora F. BIM and sensor-based data management system for construction safety monitoring Journal of Engineering, Design and Technology. 15: 738-753. DOI: 10.1108/Jedt-03-2017-0017  0.379
2017 Song X, Xu J, Zhang Z, Shen C, Xie H, Peña-Mora F, Wu Y. Reconciling strategy towards construction site selection-layout for coal-fired power plants Applied Energy. 204: 846-865. DOI: 10.1016/J.Apenergy.2017.07.091  0.366
2017 Song X, Xu J, Shen C, Peña-Mora F, Zeng Z. A Decision Making System for Construction Temporary Facilities Layout Planning in Large-scale Construction Projects International Journal of Civil Engineering. 15: 333-353. DOI: 10.1007/S40999-016-0107-1  0.41
2016 Song X, Xu J, Shen C, Peña-Mora F. Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects Canadian Journal of Civil Engineering. 43: 783-801. DOI: 10.1139/Cjce-2015-0144  0.474
2015 Ahn CR, Lee S, Peña-Mora F. Application of low-cost accelerometers for measuring the operational efficiency of a construction equipment fleet Journal of Computing in Civil Engineering. 29: 4014042. DOI: 10.1061/(Asce)Cp.1943-5487.0000337  0.318
2015 Golparvar-Fard M, Peña-Mora F, Savarese S. Automated progress monitoring using unordered daily construction photographs and IFC-based building information models Journal of Computing in Civil Engineering. 29. DOI: 10.1061/(Asce)Cp.1943-5487.0000205  0.464
2015 Lu Z, Peña-Mora F, Wang XR, Shen CQ, Riaz Z. Social Impact Project Finance: An Innovative and Sustainable Infrastructure Financing Framework☆ Procedia Engineering. 123: 300-307. DOI: 10.1016/J.Proeng.2015.10.094  0.408
2014 Han S, Saba F, Lee S, Mohamed Y, Peña-Mora F. Toward an understanding of the impact of production pressure on safety performance in construction operations. Accident; Analysis and Prevention. 68: 106-16. PMID 24184131 DOI: 10.1016/J.Aap.2013.10.007  0.339
2014 Song X, Peña-Mora F, Menassa CC, Arboleda CA. Determining the optimal premium for ADR implementation insurance in construction dispute resolution Journal of Management in Engineering. 30. DOI: 10.1061/(Asce)Me.1943-5479.0000188  0.426
2013 Ahn CR, Lee S, Peña-Mora F. Acceleromter-Based Measurement of Construction Equipment Operating Efficiency for Monitoring Environmental Performance Computing in Civil Engineering. 565-572. DOI: 10.1061/9780784413029.071  0.347
2013 Ahn C, Peña-Mora F, Lee S, Arboleda CA. Consideration of the environmental cost in construction contracting for public works: A + C and A + B + C bidding methods Journal of Management in Engineering. 29: 86-94. DOI: 10.1061/(Asce)Me.1943-5479.0000124  0.374
2013 Han S, Love PED, Peña-Mora F. A system dynamics model for assessing the impacts of design errors in construction projects Mathematical and Computer Modelling. 57: 2044-2053. DOI: 10.1016/J.Mcm.2011.06.039  0.41
2012 Peña-Mora F, Thomas JK, Golparvar-Fard M, Aziz Z. Supporting Civil Engineers during Disaster Response and Recovery Using a Segway Mobile Workstation Chariot Journal of Computing in Civil Engineering. 26: 448-455. DOI: 10.1061/(Asce)Cp.1943-5487.0000117  0.365
2012 Han S, Lee S, Peña-Mora F. Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects Journal of Construction Engineering and Management-Asce. 138: 98-109. DOI: 10.1061/(Asce)Co.1943-7862.0000406  0.462
2012 Song X, Peña-Mora F, Menassa CC, Arboleda CA. Insurance as a risk management tool for ADR implementation in construction disputes Journal of Construction Engineering and Management. 138: 14-21. DOI: 10.1061/(Asce)Co.1943-7862.0000401  0.427
2012 Mathur S, Poole MS, Peña-Mora F, Hasegawa-Johnson M, Contractor N. Detecting interaction links in a collaborating group using manually annotated data Social Networks. 34: 515-526. DOI: 10.1016/J.Socnet.2012.04.002  0.32
2012 Chen AY, PeñA-Mora F, Plans AP, Mehta SJ, Aziz Z. Supporting Urban Search and Rescue with digital assessments of structures and requests of response resources Advanced Engineering Informatics. 26: 833-845. DOI: 10.1016/J.Aei.2012.06.004  0.374
2011 Chen AY, Han S, Lee S, Pena-Mora F. A Civilian Reporting Service to Guide Converging Resources for Search and Rescue in Disaster Response Journal of Construction Engineering and Project Management. 1: 45-51. DOI: 10.6106/Jcepm.2011.1.3.045  0.352
2011 Chen AY, Peña-Mora F. Coordination of converging construction equipment in disaster response Congress On Computing in Civil Engineering, Proceedings. 299-306. DOI: 10.1061/41182(416)37  0.391
2011 Golparvar-Fard M, Peña-Mora F, Savarese S. Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry Journal of Construction Engineering and Management. 137: 1099-1116. DOI: 10.1061/(Asce)Co.1943-7862.0000371  0.432
2011 Golparvar-Fard M, Bohn J, Teizer J, Savarese S, Peña-Mora F. Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques Automation in Construction. 20: 1143-1155. DOI: 10.1016/J.Autcon.2011.04.016  0.394
2011 Chen AY, Peña-Mora F, Ouyang Y. A collaborative GIS framework to support equipment distribution for civil engineering disaster response operations Automation in Construction. 20: 637-648. DOI: 10.1016/J.Autcon.2010.12.007  0.404
2011 Roh S, Aziz Z, Peña-Mora F. An object-based 3D walk-through model for interior construction progress monitoring Automation in Construction. 20: 66-75. DOI: 10.1016/J.Autcon.2010.07.003  0.37
2009 Chen AY, Peña-Mora F. Collaborative gis for request of construction equipment in disaster response Proceedings of the 2009 Asce International Workshop On Computing in Civil Engineering. 346: 146-155. DOI: 10.1061/41052(346)15  0.36
2008 Ricaurte JL, Arboleda CA, Peña-Mora F. Civil engineers in public-private partnerships and as master planners for infrastructure development Leadership and Management in Engineering. 8: 276-286. DOI: 10.1061/(Asce)1532-6748(2008)8:4(276)  0.423
2008 Peña-Mora F, Han S, Lee S, Park M. Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach Journal of Construction Engineering and Management-Asce. 134: 701-710. DOI: 10.1061/(Asce)0733-9364(2008)134:9(701)  0.438
2007 Fard MG, Peña-Mora F. Application of Visualization Techniques for Construction Progress Monitoring Computing in Civil Engineering. 216-223. DOI: 10.1061/40937(261)27  0.381
2007 Ng HS, Peña-Mora F, Tamaki T. Dynamic Conflict Management in Large-Scale Design and Construction Projects Journal of Management in Engineering. 23: 52-66. DOI: 10.1061/(Asce)0742-597X(2007)23:2(52)  0.453
2007 Motawa IA, Anumba CJ, Lee S, Peña-Mora F. An integrated system for change management in construction Automation in Construction. 16: 368-377. DOI: 10.1016/J.Autcon.2006.07.005  0.429
2007 Lee SH, Peña-Mora F. Understanding and managing iterative error and change cycles in construction System Dynamics Review. 23: 35-60. DOI: 10.1002/Sdr.359  0.465
2006 Lee S, Peña-Mora F, Park M. Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction Projects Journal of Computing in Civil Engineering. 20: 290-300. DOI: 10.1061/(Asce)0887-3801(2006)20:4(290)  0.508
2006 Soibelman L, Peña-Mora F. Computing in civil engineering-Lessons Learned from the 2005 ASCE International Conference on Computing in Civil Engineering Journal of Computing in Civil Engineering. 20: 223-224. DOI: 10.1061/(Asce)0887-3801(2006)20:4(223)  0.346
2006 Aldunate R, Ochoa SF, Peña-Mora F, Nussbaum M. Robust Mobile Ad Hoc Space for Collaboration to Support Disaster Relief Efforts Involving Critical Physical Infrastructure Journal of Computing in Civil Engineering. 20: 13-27. DOI: 10.1061/(Asce)0887-3801(2006)20:1(13)  0.411
2006 Lee S, Peña-Mora F, Park M. Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects Journal of Construction Engineering and Management-Asce. 132: 452-464. DOI: 10.1061/(Asce)0733-9364(2006)132:5(452)  0.437
2006 Lee SH, Peña-Mora F, Park M. Dynamic planning and control methodology for strategic and operational construction project management Automation in Construction. 15: 84-97. DOI: 10.1016/J.Autcon.2005.02.008  0.469
2005 Lee SH, Peña-Mora F, Park M. Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects Journal of Construction Engineering and Management-Asce. 131: 890-902. DOI: 10.1061/(Asce)0733-9364(2005)131:8(890)  0.484
2005 Aldunate RG, Pena-Mora F, Robinson GE. Collaborative distributed decision making for large scale disaster relief operations: Drawing analogies from robust natural systems Complexity. 11: 28-38. DOI: 10.1002/Cplx.V11:2  0.334
2004 Park M, Peña-Mora F. Reliability Buffering for Construction Projects Journal of Construction Engineering and Management-Asce. 130: 626-637. DOI: 10.1061/(Asce)0733-9364(2004)130:5(626)  0.476
2003 Park M, Peña-Mora F. Dynamic change management for construction: introducing the change cycle into model‐based project management System Dynamics Review. 19: 213-242. DOI: 10.1002/Sdr.273  0.481
2002 Peña-Mora F, Dwivedi GH. Multiple device collaborative and real time analysis system for project management in civil engineering Journal of Computing in Civil Engineering. 16: 23-38. DOI: 10.1061/(Asce)0887-3801(2002)16:1(23)  0.474
2002 Peña-Mora F, Tanaka S. Information Technology Planning Framework for Japanese General Contractors Journal of Management in Engineering. 18: 138-149. DOI: 10.1061/(Asce)0742-597X(2002)18:3(138)  0.49
2001 Favela J, Peña-Mora F. An experience in collaborative software engineering education Ieee Software. 18: 47-53. DOI: 10.1109/52.914742  0.348
2001 Peña-Mora F, Choudary KK. Web-centric framework for secure and legally binding electronic transactions in large-scale A/E/C projects Journal of Computing in Civil Engineering. 15: 248-258. DOI: 10.1061/(Asce)0887-3801(2001)15:4(248)  0.429
2001 Peña-Mora F, Tamaki T. Effect of Delivery Systems on Collaborative Negotiations for Large-Scale Infrastructure Projects Journal of Management in Engineering. 17: 105-121. DOI: 10.1061/(Asce)0742-597X(2001)17:2(105)  0.459
2001 Peña-Mora F, Harpoth N. Effective Partnering In Innovative Procured Multicultural Project Journal of Management in Engineering. 17: 2-13. DOI: 10.1061/(Asce)0742-597X(2001)17:1(2)  0.455
2001 Pena-Mora F, Park M. Dynamic Planning for Fast-Tracking Building Construction Projects Journal of Construction Engineering and Management. 127: 445-456. DOI: 10.1061/(Asce)0733-9364(2001)127:6(445)  0.403
2001 Peña-Mora F, Li M. Dynamic Planning And Control Methodology For Design/Build Fast-Track Construction Projects Journal of Construction Engineering and Management-Asce. 127: 1-17. DOI: 10.1061/(Asce)0733-9364(2001)127:1(1)  0.477
2001 Peña-mora F, Vadhavkar S, Dirisala SK. Component-based software development for integrated construction management software applications Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 15: 173-187. DOI: 10.1017/S0890060401152054  0.387
2000 Vadhavkar S, Peña-Mora F. Geographically Distributed Team Interaction Space Computing in Civil and Building Engineering. 373-379. DOI: 10.1061/40513(279)48  0.34
2000 Soibelman L, Peña-Mora F. Distributed Multi-Reasoning Mechanism To Support Conceptual Structural Design Journal of Structural Engineering-Asce. 126: 733-742. DOI: 10.1061/(Asce)0733-9445(2000)126:6(733)  0.35
2000 Peña-Mora F, Hussein K, Vadhavkar S, Benjamin K. CAIRO: a concurrent engineering meeting environment for virtual design teams Artificial Intelligence in Engineering. 14: 203-219. DOI: 10.1016/S0954-1810(00)00016-9  0.413
2000 Peña-Mora F, Anumba CJ, Solari J, Duke A. An Integrated Telepresence Environment for Collaboration in Construction Engineering With Computers. 16: 287-305. DOI: 10.1007/Pl00013717  0.471
1999 Peña-Mora F, Vadhavkar S, Perkins E, Weber T. Information Technology Planning Framework For Large-Scale Projects Journal of Computing in Civil Engineering. 13: 226-237. DOI: 10.1061/(Asce)0887-3801(1999)13:4(226)  0.457
1998 Peña-Mora F, Wang C. Computer-Supported Collaborative Negotiation Methodology Journal of Computing in Civil Engineering. 12: 64-81. DOI: 10.1061/(Asce)0887-3801(1998)12:2(64)  0.437
1998 Peña-Mora F, Hussein K. Proactive meeting management for distributed collaborative design Advances in Engineering Software. 29: 839-849. DOI: 10.1016/S0965-9978(97)00068-9  0.396
1997 Filman R, Pena-Mora F. The collaborating spider Ieee Internet Computing. 1: 56-57. DOI: 10.1109/Mic.1997.589195  0.336
1997 Filman R, Peña-Mora F. The Engineering Web Ieee Internet Computing. 1: 72-74. DOI: 10.1109/Mic.1997.10006  0.311
1997 Peña-Mora F, Vadhavkar S. Augmenting design patterns with design rationale Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 11: 93-108. DOI: 10.1017/S089006040000189X  0.378
1996 Peña-Mora F, Hussein K, Sriram RD. CAIRO: a system for facilitating communication in a distributed collaborative engineering environment Computers in Industry. 29: 37-50. DOI: 10.1016/0166-3615(95)00053-4  0.361
1995 Peña-Mora F, Sriram D, Logcher R. Design rationale for computer-supported conflict mitigation Journal of Computing in Civil Engineering. 9: 57-72. DOI: 10.1061/(Asce)0887-3801(1995)9:1(57)  0.419
1995 Peña-Mora F, Sriram RD, Logcher R. Conflict mitigation system for collaborative engineering Ai Edam Artificial Intelligence For Engineering Design, Analysis and Manufacturing. 9: 101-124. DOI: 10.1017/S0890060400002158  0.399