Year |
Citation |
Score |
2020 |
Shang L, Migliaccio GC. Demystifying progressive design build: implementation issues and lessons learned through case study analysis Organization, Technology and Management in Construction: An International Journal. 12: 2095-2108. DOI: 10.2478/otmcj-2020-0006 |
0.531 |
|
2016 |
Lee W, Migliaccio GC. Physiological cost of concrete construction activities Construction Innovation: Information, Process, Management. 16: 281-306. DOI: 10.1108/Ci-10-2015-0051 |
0.367 |
|
2014 |
Minchin E, Ptschelinzew L, Migliaccio GC, Gatti U, Atkins K, Warne T, Hostetler G, Asiamah S. Guide for Design Management on Design-Build and Construction Manager/General Contractor Projects Nchrp Report. DOI: 10.17226/22273 |
0.533 |
|
2014 |
Gatti UC, Migliaccio GC, Laird L. Design management in design-build megaprojects: Sr 99 bored tunnel case study Practice Periodical On Structural Design and Construction. 19: 148-158. DOI: 10.1061/(Asce)Sc.1943-5576.0000182 |
0.449 |
|
2013 |
Ptschelinzew LR, Minchin RE, Migliaccio GC, Atkins KE, Hostetler GA, Warne TR, Nettuno G. Best practices in design process development for accelerated construction project delivery Isec 2013 - 7th International Structural Engineering and Construction Conference: New Developments in Structural Engineering and Construction. 1205-1210. DOI: 10.3850/978-981-07-5354-2-C-4-12 |
0.549 |
|
2013 |
Bogus SM, Migliaccio GC, Jin R. Study of the relationship between procurement duration and project performance in design-build projects: Comparison between water/wastewater and transportation sectors Journal of Management in Engineering. 29: 382-391. DOI: 10.1061/(Asce)Me.1943-5479.0000165 |
0.601 |
|
2013 |
Cheng T, Migliaccio GC, Teizer J, Gatti UC. Data fusion of real-time location sensing and physiological status monitoring for ergonomics analysis of construction workers Journal of Computing in Civil Engineering. 27: 320-335. DOI: 10.1061/(Asce)Cp.1943-5487.0000222 |
0.358 |
|
2013 |
Cheng T, Teizer J, Migliaccio GC, Gatti UC. Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data Automation in Construction. 29: 24-39. DOI: 10.1016/J.Autcon.2012.08.003 |
0.388 |
|
2011 |
Migliaccio GC, Knoebel G, Martinez R, Albert D, Hurd J. A Guidebook for Successful Communication, Cooperation, and Coordination Strategies Between Transportation Agencies and Tribal Communities Nchrp Report. DOI: 10.17226/14528 |
0.414 |
|
2011 |
Migliaccio GC, Guindani M, Zhang S, Ghorai S. Regression-based prediction methods for adjusting construction cost estimates by project location Proceedings, Annual Conference - Canadian Society For Civil Engineering. 4: 2611-2619. |
0.344 |
|
2010 |
Bogus SM, Migliaccio GC, Cordova AA. Assessment of data quality for evaluations of manual pavement distress Transportation Research Record. 1-8. DOI: 10.3141/2170-01 |
0.309 |
|
2010 |
Migliaccio GC, Bogus SM, Chen A. Effect of duration of design-build procurement on performance of transportation projects Transportation Research Record. 67-73. DOI: 10.3141/2151-09 |
0.615 |
|
2010 |
Migliaccio GC, Martinez RM. Establishing a collaborative environment among project stakeholders Construction Research Congress 2010: Innovation For Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress. 747-756. DOI: 10.1061/41109(373)75 |
0.477 |
|
2009 |
Martinez RM, Migliaccio GC, Albert D, Holley T. Review of strategies for enabling collaboration between transportation agencies and native American tribes Transportation Research Record. 113-119. DOI: 10.3141/2119-14 |
0.437 |
|
2009 |
Migliaccio GC, Shrestha PP. Analysis of design-build procurement activities durations for highway projects Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 229-238. DOI: 10.1061/41020(339)24 |
0.712 |
|
2009 |
Hale DR, Shrestha PP, Gibson GE, Migliaccio GC. Empirical comparison of design/build and design/bid/build project delivery methods Journal of Construction Engineering and Management. 135: 579-587. DOI: 10.1061/(Asce)Co.1943-7862.0000017 |
0.717 |
|
2009 |
Migliaccio GC, Gibson GE, O'connor JT. Procurement of design-build services: Two-phase selection for highway projects Journal of Management in Engineering. 25: 29-39. DOI: 10.1061/(Asce)0742-597X(2009)25:1(29) |
0.685 |
|
2008 |
Migliaccio GC, Gibson GE, O'Connor JT. Changing Project Delivery Strategy: An Implementation Framework Public Works Management & Policy. 12: 483-502. DOI: 10.1177/1087724X07311805 |
0.63 |
|
2007 |
Shrestha PP, Migliaccio GC, O'Connor JT, Gibson GE. Benchmarking of large design-build highway projects one-to-one comparison and comparison with design-bid-build projects Transportation Research Record. 17-25. DOI: 10.3141/1994-03 |
0.707 |
|
2006 |
Migliaccio GC, Goel S, O'Connor JT. Life-cycle cost analysis for selection of energy-efficient building components in lodging facilities Aei 2006: Building Integration Solutions - Proceedings of the 2006 Architectural Engineering National Conference. 2006: 54. DOI: 10.1061/40798(190)54 |
0.515 |
|
2005 |
Migliaccio GC, Gibson GE, O'Connor JT. Design-build procurement process model for delivering highways in Texas Proceedings of the 2005 Asce International Conference On Computing in Civil Engineering. 1639-1646. |
0.553 |
|
2005 |
Migliaccio GC, Gibson GE, O'Connor JT. Delivering highway projects through design-build: Analysis of the comprehensive development agreement (CDA) procurement process in Texas Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress. 919-928. |
0.671 |
|
Show low-probability matches. |