Year |
Citation |
Score |
2017 |
Salem O, Salman B, Ghorai S. Accelerating construction of roadway bridges using alternative techniques and procurement methods Transport. 33: 567-579. DOI: 10.3846/16484142.2017.1300942 |
0.584 |
|
2016 |
Chen X, Salem O, Salman B. Life-Cycle Benefit–Cost Analysis Framework for Ramp-Metering Deployments Transportation Research Record. 2554: 69-76. DOI: 10.3141/2554-08 |
0.571 |
|
2012 |
Salem O, Salman B, Najafi M. Culvert asset management practices and deterioration modeling Transportation Research Record. 1-7. DOI: 10.3141/2285-01 |
0.59 |
|
2012 |
Salman B, Salem O. Risk assessment of wastewater collection lines using failure models and criticality ratings Journal of Pipeline Systems Engineering and Practice. 3: 68-76. DOI: 10.1061/(Asce)Ps.1949-1204.0000100 |
0.561 |
|
2012 |
Salman B, Salem O. Modeling Failure of Wastewater Collection Lines Using Various Section-Level Regression Models Journal of Infrastructure Systems. 18: 146-154. DOI: 10.1061/(Asce)Is.1943-555X.0000075 |
0.592 |
|
2009 |
Sobeih T, Salem O, Genaidy A, Abdelhamid T, Shell R. Psychosocial factors and musculoskeletal disorders in the construction industry Journal of Construction Engineering and Management. 135: 267-277. DOI: 10.1061/(Asce)0733-9364(2009)135:4(267) |
0.333 |
|
2007 |
Salem O, Shahin A, Khalifa Y. Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models Journal of Construction Engineering and Management. 133: 982-992. DOI: 10.1061/(Asce)0733-9364(2007)133:12(982) |
0.307 |
|
2007 |
Richard D, Hong T, Hastak M, Mirmiran A, Salem O. Life-cycle performance model for composites in construction Composites Part B: Engineering. 38: 236-246. DOI: 10.1016/J.Compositesb.2006.04.001 |
0.393 |
|
2006 |
Sobeih TM, Salem O, Daraiseh N, Genaidy A, Shell R. Psychosocial factors and musculoskeletal disorders in the construction industry: a systematic review Theoretical Issues in Ergonomics Science. 7: 329-344. DOI: 10.1080/14639220500090760 |
0.309 |
|
2006 |
Salem O, Basu B, Miller R, Randall J, Swanson J, Engel R. Accelerating the Construction of a Highway Bridge in Ohio Practice Periodical On Structural Design and Construction. 11: 98-104. DOI: 10.1061/(Asce)1084-0680(2006)11:2(98) |
0.324 |
|
2006 |
Salem O, Solomon J, Genaidy A, Minkarah I. Lean Construction: From Theory to Implementation Journal of Management in Engineering. 22: 168-175. DOI: 10.1061/(Asce)0742-597X(2006)22:4(168) |
0.352 |
|
2003 |
Salem O, AbouRizk S, Ariaratnam S. Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives Journal of Infrastructure Systems. 9: 6-15. DOI: 10.1061/(Asce)1076-0342(2003)9:1(6) |
0.622 |
|
Show low-probability matches. |