Year |
Citation |
Score |
2019 |
Bae KH, Jones M, Evans G, Antimisiaris D. Simulation modelling of patient flow and capacity planning for regional long-term care needs: a case study. Health Systems (Basingstoke, England). 8: 1-16. PMID 31214351 DOI: 10.1080/20476965.2017.1405873 |
0.316 |
|
2016 |
Khodabandeh E, Bai L, Heragu SS, Evans GW, Elrod T, Shirkness M. Modelling and solution of a large-scale vehicle routing problem at GE appliances & lighting International Journal of Production Research. 1-17. DOI: 10.1080/00207543.2016.1220685 |
0.352 |
|
2016 |
Sun L, Depuy GW, Evans GW. Multi-objective optimization models for patient allocation during a pandemic influenza outbreak Computers and Operations Research. 51: 350-359. DOI: 10.1016/J.Cor.2013.12.001 |
0.32 |
|
2015 |
Wu H, Evans G, Bae KH. Production control in a complex production system using approximate dynamic programming International Journal of Production Research. DOI: 10.1080/00207543.2015.1086035 |
0.353 |
|
2015 |
Khadgi P, Bai L, Evans G, Zheng QP. A simulation model with multi-attribute utility functions for energy consumption scheduling in a smart grid Energy Systems. 6: 533-550. DOI: 10.1007/S12667-015-0153-9 |
0.325 |
|
2014 |
Tuzkaya UR, Heragu SS, Evans GW, Johnson M. Designing a large-scale emergency logistics network - a case study for Kentucky European Journal of Industrial Engineering. 8: 513-532. DOI: 10.1504/Ejie.2014.064758 |
0.363 |
|
2014 |
Harpring R, Evans GW, Barber R, Deck SM. Improving efficiency in social services with discrete event simulation Computers and Industrial Engineering. 70: 159-167. DOI: 10.1016/J.Cie.2014.01.016 |
0.338 |
|
2013 |
Yang X, Heragu SS, Evans GW, Shirkness MD, Coats A. The application of linear programming by the General Electric Company to efficiently allocate routes to trucking companies European Journal of Industrial Engineering. 7: 38-54. DOI: 10.1504/Ejie.2013.051596 |
0.367 |
|
2013 |
Gupta A, Evans GW, Heragu SS. Simulation and optimization modeling for drive-through mass vaccination - A generalized approach Simulation Modelling Practice and Theory. 37: 99-106. DOI: 10.1016/J.Simpat.2013.06.004 |
0.317 |
|
2009 |
Gupta A, Evans GW. A goal programming model for the operation of closed-loop supply chains Engineering Optimization. 41: 713-735. DOI: 10.1080/03052150902802242 |
0.413 |
|
2008 |
Du F, Evans GW. A bi-objective reverse logistics network analysis for post-sale service Computers and Operations Research. 35: 2617-2634. DOI: 10.1016/J.Cor.2006.12.020 |
0.391 |
|
2007 |
Ko HJ, Evans GW. A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs Computers and Operations Research. 34: 346-366. DOI: 10.1016/J.Cor.2005.03.004 |
0.375 |
|
2006 |
Anderson NP, Evans GW, Biles WE. Simulation optimization of logistics systems through the use of variance reduction techniques and criterion models Engineering Optimization. 38: 441-460. DOI: 10.1080/03052150600574283 |
0.403 |
|
2006 |
Ellspermann SJ, Evans GW, Basadur M. The impact of training on the formulation of ill-structured problems Omega. 35: 221-236. DOI: 10.1016/J.Omega.2005.05.005 |
0.305 |
|
2000 |
Kim KJ, Moskowitz H, Dhingra A, Evans G. Fuzzy multicriteria models for quality function deployment European Journal of Operational Research. 121: 504-518. DOI: 10.1016/S0377-2217(99)00048-X |
0.371 |
|
1999 |
Kolli S, Evans GW. A multiple objective integer programming approach for planning franchise expansion Computers & Industrial Engineering. 37: 543-561. DOI: 10.1016/S0360-8352(00)00027-9 |
0.362 |
|
1994 |
Mollaghasemi M, Evans GW. Multicriteria Design of Manufacturing Systems Through Simulation Optimization Ieee Transactions On Systems, Man and Cybernetics. 24: 1407-1411. DOI: 10.1109/21.310518 |
0.411 |
|
1994 |
Basadur M, Ellspermann S, Evans G. A new methodology for formulating ill-structured problems Omega-International Journal of Management Science. 22: 627-645. DOI: 10.1016/0305-0483(94)90053-1 |
0.352 |
|
1993 |
Abou-Amara I, Evans GW, Usher JS. A Multtobjecttve Approach To Reliability Demonstration Testing Iie Transactions. 25: 52-58. DOI: 10.1080/07408179308964290 |
0.335 |
|
1993 |
Mollaghasemi M, Evans GW. A methodology for stochastic optimization of multiple response simulation models Engineering Optimization. 21: 265-275. DOI: 10.1080/03052159308940979 |
0.39 |
|
1993 |
Gupta MC, Gupta YP, Evans GW. Operations planning and scheduling problems in advanced manufacturing systems International Journal of Production Research. 31: 869-900. DOI: 10.1080/00207549308956763 |
0.406 |
|
1992 |
Evans GW, Haddock J. Modelling tools for flexible manufacturing systems Production Planning and Control. 3: 158-167. DOI: 10.1080/09537289208919385 |
0.351 |
|
1992 |
Evans GW, Mollaghasemi M, Stuckman B, Kolli S. Global Optimization of Manufacturing System Simulations Ifac Proceedings Volumes. 25: 204-206. DOI: 10.1016/S1474-6670(17)49493-6 |
0.413 |
|
1991 |
Gupta YP, Evans GW, Gupta MC. A review of multi-criterion approaches to FMS scheduling problems International Journal of Production Economics. 22: 13-31. DOI: 10.1016/0925-5273(91)90032-O |
0.379 |
|
1991 |
Evans GW, Emberton GR. Bicriterion design of process control charts International Journal of Production Economics. 22: 141-150. DOI: 10.1016/0925-5273(91)90006-F |
0.391 |
|
1991 |
Cambron KE, Evans GW. Layout design using the analytic hierarchy process Computers & Industrial Engineering. 20: 211-229. DOI: 10.1016/0360-8352(91)90026-3 |
0.391 |
|
1989 |
Evans GW, Fairbairn R. Selection and Scheduling of Advanced Missions for NASA Using 0-1 Integer Linear Programming Journal of the Operational Research Society. 40: 971-981. DOI: 10.1057/Jors.1989.170 |
0.437 |
|
1987 |
Evans GW, Alexander SM. Multiobjective Decision Analysis for Acceptance Sampling Plans Iie Transactions. 19: 308-316. DOI: 10.1080/07408178708975401 |
0.335 |
|
1986 |
Evans GW, Morin TL. Hybrid Dynamic Programming/Branch-and-Bound Strategies for Electric Power Generation Planning Iie Transactions. 18: 138-147. DOI: 10.1080/07408178608975341 |
0.385 |
|
1984 |
Evans GW. An Overview of Techniques for Solving Multiobjective Mathematical Programs Management Science. 30: 1268-1282. DOI: 10.1287/Mnsc.30.11.1268 |
0.353 |
|
1982 |
Evans GW, Morin TL, Moskowitz H. Multiobjective Energy Generation Planning Under Uncertainty Iie Transactions. 14: 183-192. DOI: 10.1080/05695558208975058 |
0.372 |
|
1978 |
Moskowitz H, Evans GW, Jimenez-Lerma I. Development of a multiattribute value function for long-range electrical generation expansion Ieee Transactions On Engineering Management. 78-87. DOI: 10.1109/Tem.1978.6447301 |
0.335 |
|
Show low-probability matches. |